Solar power plant, New York
Morris Ridge Solar power plant, New York
Morris Ridge Solar is a 177 MW solar power plant in Livingston County, New York, operated by Morris Ridge Solar Energy Center, LLC, and it generated 313,307 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in New York, and its capacity factor sits at the 27th percentile of U.S. solar plants. By 2025 generation it ranks 1,918th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Morris Ridge Solar plant run compared with other solar plants?
The Morris Ridge Solar plant had a capacity factor of 20% in 2025 on 177 MW of net summer capacity, the 27th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 74 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Morris Ridge Solar | 20% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Morris Ridge Solar plant generating more or less than last year?
Morris Ridge Solar generated 313,307 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 7.6% behind the same months of 2025. 2024 has output for only 2 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 20,861 |
| 2025 | 313,307 |
| 2026 through August | 213,938 |
| 2025, same months | 231,634 |
Monthly generation, Nov 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 38,484 |
| July 2026 | 40,664 |
| June 2026 | 39,503 |
| May 2026 | 34,021 |
| April 2026 | 27,654 |
| March 2026 | 19,560 |
| February 2026 | 9,024 |
| January 2026 | 5,028 |
| December 2025 | 7,396 |
| November 2025 | 12,100 |
| October 2025 | 26,255 |
| September 2025 | 35,922 |
| August 2025 | 42,445 |
| July 2025 | 44,835 |
| June 2025 | 41,275 |
| May 2025 | 29,519 |
| April 2025 | 30,247 |
| March 2025 | 21,464 |
| February 2025 | 12,816 |
| January 2025 | 9,033 |
| December 2024 | 8,206 |
| November 2024 | 12,655 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Morris Ridge Solar plant, and when do they retire?
1 operable generator totals 177 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 177 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| MOR01 | Operating | Solar Photovoltaic | 177 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Morris Ridge Solar plant?
2 owners report shares in Morris Ridge Solar; Morris Ridge Solar Energy Center, LLC holds the largest named share, 68.0% or about 120 MW. Morris Ridge Solar Energy Center, LLC operates the plant.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| Morris Ridge Solar Energy Center, LLC | 68.0% | 120 | 213,049 |
| U.S. BANCORP Community Development Corporation | 32.0% | 57 | 100,258 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
Where is the Morris Ridge Solar plant?
Morris Ridge Solar is in Mount Morris, Livingston County, New York, at 42.6631° N, 77.8908° W. It sits in the New York Independent System Operator balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in New York are similar in size?
New York has 718 operable solar plants with 3,116 MW of capacity, and Morris Ridge Solar's 177 MW is 6% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Morris Ridge Solar | Livingston | 177 | 313,307 |
| High River Energy Center, LLC | Montgomery | 90 | 156,395 |
Source: EIA Forms EIA-860 and EIA-923, 2025.