Morrow Point hydroelectric power plant, Colorado

Morrow Point is a 173 MW hydro power plant in Montrose County, Colorado, operated by U S Bureau of Reclamation, and it generated 262,820 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Colorado, and its capacity factor sits at the 15th percentile of U.S. hydro plants. By 2025 generation it ranks 2,146th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

173 MWNameplate capacity
17%Capacity factor, 2025, 15th percentile, on 173 MW net summer
0.5%Of CO generation, 2025
55 yearsAverage generator age, by MW

How hard does the Morrow Point plant run compared with other hydro plants?

The Morrow Point plant had a capacity factor of 17% in 2025 on 173 MW of net summer capacity, the 15th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 63 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Morrow Point17%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Morrow Point plant generating more or less than last year?

Generation at Morrow Point fell 15.2% from 2024 to 2025, from 309,764 MWh to 262,820 MWh.

Net generation by period
PeriodMWh
2024309,764
2025262,820
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20256,203
November 20255,340
October 202523,688
September 202516,025
August 202534,302
July 202536,951
June 202533,829
May 202541,166
April 202525,308
March 202517,632
February 202511,494
January 202510,882
December 20248,500
November 20245,401
October 202425,670
September 202421,763
August 202434,867
July 202440,682
June 202446,668
May 202472,262
April 202421,969
March 202412,546
February 20248,170
January 202411,266

Source: EIA Form EIA-923, through August 2026.

How much of Colorado's electricity comes from the Morrow Point plant?

Morrow Point made 0.5% of the 55,830,894 MWh reported by Colorado plants in 2025, from 0.8% of the state's 22,712 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 43rd largest of 321 plants in Colorado, the 1,801st largest of 14,327 in the U.S. and the 84th largest of 1,393 hydro plants. By 2025 generation it is the 45th largest of 292 generating plants in the state.

Morrow Point within Colorado, 2025
MeasureThis plantColoradoShare
Capacity (MW)17322,7120.8%
Generation (MWh)262,82055,830,8940.5%
Hydro capacity (MW)17367925.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Morrow Point plant, and when do they retire?

2 operable generators total 173 MW, with an average age of 55 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s2173100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric871970n/a
2OperatingConventional Hydroelectric871971n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Morrow Point plant?

EIA lists no joint owners for Morrow Point. U S Bureau of Reclamation operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Morrow Point plant?

Morrow Point is in Montrose, Montrose County, Colorado, at 38.4518° N, 107.5393° W. It sits in the Western Area Power Administration - Rocky Mountain Region balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.