Natural gas power plant, New Jersey
NAEA Ocean Peaking Power LLC natural gas power plant, New Jersey
NAEA Ocean Peaking Power LLC is a 398 MW natural gas power plant in Ocean County, New Jersey, operated by Essential Power Operating Company, LLC, and it generated 302,350 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in New Jersey, and its capacity factor sits at the 36th percentile of U.S. natural gas plants. By 2025 generation it ranks 1,962nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the NAEA Ocean Peaking Power LLC plant run compared with other natural gas plants?
The NAEA Ocean Peaking Power LLC plant had a capacity factor of 10% in 2025 on 333 MW of net summer capacity, the 36th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 38 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| NAEA Ocean Peaking Power LLC | 10% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the NAEA Ocean Peaking Power LLC plant generating more or less than last year?
Generation at NAEA Ocean Peaking Power LLC rose 60.7% from 2024 to 2025, from 188,179 MWh to 302,350 MWh.
| Period | MWh |
|---|---|
| 2024 | 188,179 |
| 2025 | 302,350 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 777 |
| November 2025 | 10,375 |
| October 2025 | 14,269 |
| September 2025 | 15,197 |
| August 2025 | 27,916 |
| July 2025 | 94,376 |
| June 2025 | 45,158 |
| May 2025 | 23,338 |
| April 2025 | 55,613 |
| March 2025 | 6,091 |
| February 2025 | 6,382 |
| January 2025 | 2,857 |
| December 2024 | 1,411 |
| November 2024 | 3,151 |
| October 2024 | 2,991 |
| September 2024 | 7,180 |
| August 2024 | 29,953 |
| July 2024 | 48,723 |
| June 2024 | 24,657 |
| May 2024 | 24,474 |
| April 2024 | 32,524 |
| March 2024 | 5,670 |
| February 2024 | 607 |
| January 2024 | 6,838 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the NAEA Ocean Peaking Power LLC plant, and when do they retire?
2 operable generators total 398 MW, with an average age of 22 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 2 | 398 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| OPP3 | Operating | Natural Gas Fired Combustion Turbine | 199 | 2003 | n/a |
| OPP4 | Operating | Natural Gas Fired Combustion Turbine | 199 | 2003 | n/a |
| OPP5 | Postponed indefinitely | Natural Gas Fired Combustion Turbine | 192 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the NAEA Ocean Peaking Power LLC plant?
NAEA Ocean Peaking Power LLC is the only joint owner reported for NAEA Ocean Peaking Power LLC, with 100.0%. Essential Power Operating Company, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the NAEA Ocean Peaking Power LLC plant?
NAEA Ocean Peaking Power LLC is in Lakewood, Ocean County, New Jersey, at 40.0633° N, 74.1672° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in New Jersey are similar in size?
New Jersey has 50 operable natural gas plants with 12,346 MW of capacity, and NAEA Ocean Peaking Power LLC's 398 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Kearny Generating Station | Hudson | 605 | 269,514 |
| Gilbert | Hunterdon | 512 | 88,321 |
| Sayreville Cogeneration Facility | Middlesex | 430 | 878,761 |
| NAEA Ocean Peaking Power LLC | Ocean | 398 | 302,350 |
| NAEA Lakewood LLC | Ocean | 288 | 226,027 |
| Eagle Point Power Generation | Gloucester | 252 | 178,083 |
| Burlington Generating Station | Burlington | 242 | 52,340 |
Source: EIA Forms EIA-860 and EIA-923, 2025.