Biomass power plant, Maine
NE Renewable Power West Enfield biomass power plant, Maine
NE Renewable Power West Enfield is a 27.5 MW biomass power plant in Penobscot County, Maine, operated by Stored Solar J&WE, and it generated 42,629 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Maine, and its capacity factor sits at the 8th percentile of U.S. biomass plants. By 2025 generation it ranks 4,277th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the NE Renewable Power West Enfield plant run compared with other biomass plants?
The NE Renewable Power West Enfield plant had a capacity factor of 24% in 2025 on 20.4 MW of net summer capacity, the 8th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 87 days at full output out of 365.
0%Shaded: the middle half of biomass plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| NE Renewable Power West Enfield | 24% |
| Biomass plants, 75th percentile | 65% |
| Biomass plants, median | 48% |
| Biomass plants, 25th percentile | 35% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the NE Renewable Power West Enfield plant generating more or less than last year?
NE Renewable Power West Enfield generated 42,629 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 9 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 50,628 |
| 2025 | 42,629 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 12,114 |
| November 2025 | 2,251 |
| October 2025 | 0 |
| September 2025 | 0 |
| August 2025 | 0 |
| July 2025 | 0 |
| June 2025 | 0 |
| May 2025 | 0 |
| April 2025 | 99 |
| March 2025 | 7,350 |
| February 2025 | 10,239 |
| January 2025 | 10,576 |
| December 2024 | 10,878 |
| November 2024 | 7,874 |
| October 2024 | 492 |
| September 2024 | 880 |
| August 2024 | 3,991 |
| July 2024 | 5,176 |
| June 2024 | 4,901 |
| May 2024 | 0 |
| April 2024 | 0 |
| March 2024 | 0 |
| February 2024 | 7,498 |
| January 2024 | 8,938 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the NE Renewable Power West Enfield plant, and when do they retire?
1 operable generator totals 27.5 MW, with an average age of 38 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1980s | 1 | 28 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Wood/Wood Waste Biomass | 28 | 1987 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the NE Renewable Power West Enfield plant?
EIA lists no joint owners for NE Renewable Power West Enfield. Stored Solar J&WE operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the NE Renewable Power West Enfield plant?
NE Renewable Power West Enfield is in West Enfield, Penobscot County, Maine, at 45.2537° N, 68.6279° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which biomass plants in Maine are similar in size?
Maine has 15 operable biomass plants with 557 MW of capacity, and NE Renewable Power West Enfield's 27.5 MW is 5% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| ReEnergy Livermore Falls | Androscoggin | 40 | 273,806 |
| Red Shield Envir Old Town Facility | Penobscot | 29 | 0 |
| NE Renewable Power Jonesboro | Washington | 28 | 5 |
| NE Renewable Power West Enfield | Penobscot | 28 | 42,621 |
| Eagle Point Energy Center | Penobscot | 25 | 0 |
Source: EIA Forms EIA-860 and EIA-923, 2025.