Solar power plant, Oklahoma
North Fork Solar Project, Oklahoma
North Fork Solar Project is a 120 MW solar power plant in Kiowa County, Oklahoma, operated by North Fork Solar Project, LLC, and it generated 294,342 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Oklahoma, and its capacity factor sits at the 82nd percentile of U.S. solar plants. By 2025 generation it ranks 2,003rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the North Fork Solar Project plant run compared with other solar plants?
The North Fork Solar Project plant had a capacity factor of 28% in 2025 on 120 MW of net summer capacity, the 82nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 102 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| North Fork Solar Project | 28% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the North Fork Solar Project plant generating more or less than last year?
North Fork Solar Project generated 294,342 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 14.3% ahead of the same months of 2025. 2024 has output for only 8 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 215,183 |
| 2025 | 294,342 |
| 2026 through August | 230,595 |
| 2025, same months | 201,730 |
Monthly generation, May 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 34,931 |
| July 2026 | 36,059 |
| June 2026 | 32,209 |
| May 2026 | 31,287 |
| April 2026 | 25,800 |
| March 2026 | 26,017 |
| February 2026 | 23,965 |
| January 2026 | 20,327 |
| December 2025 | 17,973 |
| November 2025 | 20,525 |
| October 2025 | 25,531 |
| September 2025 | 28,583 |
| August 2025 | 31,227 |
| July 2025 | 35,015 |
| June 2025 | 33,229 |
| May 2025 | 32,865 |
| April 2025 | 15,023 |
| March 2025 | 21,608 |
| February 2025 | 14,764 |
| January 2025 | 17,999 |
| December 2024 | 13,005 |
| November 2024 | 14,983 |
| October 2024 | 26,422 |
| September 2024 | 30,125 |
| August 2024 | 36,085 |
| July 2024 | 36,017 |
| June 2024 | 32,905 |
| May 2024 | 25,641 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the North Fork Solar Project plant, and when do they retire?
1 operable generator totals 120 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 120 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| NFORK | Operating | Solar Photovoltaic | 120 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the North Fork Solar Project plant?
EIA lists no joint owners for North Fork Solar Project. North Fork Solar Project, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the North Fork Solar Project plant?
North Fork Solar Project is in Snyder, Kiowa County, Oklahoma, at 34.6178° N, 98.9826° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Oklahoma are similar in size?
Oklahoma has 14 operable solar plants with 271 MW of capacity, and North Fork Solar Project's 120 MW is 44% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| North Fork Solar Project | Kiowa | 120 | 294,342 |
| Kiowa County Solar Project | Kiowa | 100 | 235,865 |
Source: EIA Forms EIA-860 and EIA-923, 2025.