Petroleum power plant, Maryland
NRG Chalk Point CT petroleum power plant, Maryland
NRG Chalk Point CT is a 94 MW petroleum power plant in Prince Georges County, Maryland, operated by NRG Chalk Point CT, and it generated 7,054 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 70th percentile of U.S. petroleum plants. By 2025 generation it ranks 7,233rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the NRG Chalk Point CT plant run compared with other petroleum plants?
The NRG Chalk Point CT plant had a capacity factor of 1% in 2025 on 80.2 MW of net summer capacity, the 70th percentile of the 143 U.S. petroleum plants with at least 20 MW. The typical petroleum plant reached 1%. That equals about 4 days at full output out of 365.
0%Shaded: the middle half of petroleum plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| NRG Chalk Point CT | 1% |
| Petroleum plants, 75th percentile | 1% |
| Petroleum plants, median | 1% |
| Petroleum plants, 25th percentile | 0% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the NRG Chalk Point CT plant generating more or less than last year?
NRG Chalk Point CT generated 7,054 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 319.5% ahead of the same months of 2025. 2024 has output for only 4 months, so the two years are not compared.
13 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.
| Period | MWh |
|---|---|
| 2024 | 697 |
| 2025 | 7,054 |
| 2026 through August | 18,946 |
| 2025, same months | 4,516 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 1,371 |
| July 2026 | 3,061 |
| June 2026 | 1,522 |
| May 2026 | -41 |
| April 2026 | 602 |
| March 2026 | 85 |
| February 2026 | 5,641 |
| January 2026 | 6,705 |
| December 2025 | 872 |
| November 2025 | 1,462 |
| October 2025 | -54 |
| September 2025 | 258 |
| August 2025 | 594 |
| July 2025 | 1,689 |
| June 2025 | 1,397 |
| May 2025 | 52 |
| April 2025 | -60 |
| March 2025 | -14 |
| February 2025 | -57 |
| January 2025 | 915 |
| December 2024 | 39 |
| November 2024 | -60 |
| October 2024 | -49 |
| September 2024 | -19 |
| August 2024 | -44 |
| July 2024 | 638 |
| June 2024 | 233 |
| May 2024 | -12 |
| April 2024 | -25 |
| March 2024 | 72 |
| February 2024 | -36 |
| January 2024 | -40 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the NRG Chalk Point CT plant, and when do they retire?
1 operable generator totals 94 MW, with an average age of 35 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1990s | 1 | 94 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SGT1 | Operating | Petroleum Liquids | 94 | 1990 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the NRG Chalk Point CT plant?
EIA lists no joint owners for NRG Chalk Point CT. NRG Chalk Point CT operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the NRG Chalk Point CT plant?
NRG Chalk Point CT is in Aquasco, Prince Georges County, Maryland, at 38.5444° N, 76.6861° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which petroleum plants in Maryland are similar in size?
Maryland has 10 operable petroleum plants with 1,478 MW of capacity, and NRG Chalk Point CT's 94 MW is 6% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Vienna Operations | Dorchester | 181 | 13,191 |
| NRG Chalk Point CT | Prince Georges | 94 | 7,132 |
| Philadelphia | Baltimore City | 83 | 9,262 |
Source: EIA Forms EIA-860 and EIA-923, 2025.