Wind power plant, Illinois
Panther Creek Wind Project, Illinois
Panther Creek Wind Project is a 54.4 MW wind power plant in Pike County, Illinois, operated by Greenbacker Renewable Energy Corporation, and it generated 134,239 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Illinois, and its capacity factor sits at the 32nd percentile of U.S. wind plants. By 2025 generation it ranks 3,072nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Panther Creek Wind Project plant run compared with other wind plants?
The Panther Creek Wind Project plant had a capacity factor of 28% in 2025 on 54.4 MW of net summer capacity, the 32nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 103 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Panther Creek Wind Project | 28% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Panther Creek Wind Project plant generating more or less than last year?
Panther Creek Wind Project generated 134,239 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 20.1% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 134,239 |
| 2026 through August | 102,943 |
| 2025, same months | 85,728 |
Monthly generation, Feb 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 6,076 |
| July 2026 | 4,419 |
| June 2026 | 9,938 |
| May 2026 | 10,395 |
| April 2026 | 18,087 |
| March 2026 | 20,498 |
| February 2026 | 15,185 |
| January 2026 | 18,345 |
| December 2025 | 18,530 |
| November 2025 | 16,132 |
| October 2025 | 10,268 |
| September 2025 | 3,581 |
| August 2025 | 5,728 |
| July 2025 | 5,571 |
| June 2025 | 7,477 |
| May 2025 | 10,824 |
| April 2025 | 16,021 |
| March 2025 | 20,154 |
| February 2025 | 19,953 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Panther Creek Wind Project plant, and when do they retire?
1 operable generator totals 54.4 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 54 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WTGE | Operating | Onshore Wind Turbine | 54 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Panther Creek Wind Project plant?
EIA lists no joint owners for Panther Creek Wind Project. Greenbacker Renewable Energy Corporation operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Panther Creek Wind Project plant?
Panther Creek Wind Project is in Pittsfield, Pike County, Illinois, at 39.6206° N, 90.8761° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Illinois are similar in size?
Illinois has 55 operable wind plants with 8,458 MW of capacity, and Panther Creek Wind Project's 54.4 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Mendota Hills, LLC | Lee | 76 | 255,925 |
| Providence Heights Wind LLC | Bureau | 72 | 134,840 |
| Whitney Hill Wind Power LLC | Logan | 65 | 142,369 |
| Panther Creek Wind Project | Pike | 54 | 134,239 |
| Crescent Ridge | Bureau | 53 | 199,164 |
Source: EIA Forms EIA-860 and EIA-923, 2025.