Wind power plant, Texas
Patriot Wind Farm, Texas
Patriot Wind Farm is a 226 MW wind power plant in Nueces County, Texas, operated by Avangrid Power LLC, and it generated 668,970 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 53rd percentile of U.S. wind plants. By 2025 generation it ranks 1,032nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Patriot Wind Farm plant run compared with other wind plants?
The Patriot Wind Farm plant had a capacity factor of 34% in 2025 on 226 MW of net summer capacity, the 53rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 123 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Patriot Wind Farm | 34% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Patriot Wind Farm plant generating more or less than last year?
Generation at Patriot Wind Farm rose 17.2% from 2024 to 2025, from 570,879 MWh to 668,970 MWh. Through August 2026 it is running 3.0% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 570,879 |
| 2025 | 668,970 |
| 2026 through August | 491,349 |
| 2025, same months | 506,325 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 56,657 |
| July 2026 | 59,601 |
| June 2026 | 52,391 |
| May 2026 | 46,216 |
| April 2026 | 74,511 |
| March 2026 | 83,000 |
| February 2026 | 60,791 |
| January 2026 | 58,182 |
| December 2025 | 40,930 |
| November 2025 | 63,781 |
| October 2025 | 32,220 |
| September 2025 | 25,714 |
| August 2025 | 32,598 |
| July 2025 | 62,946 |
| June 2025 | 53,842 |
| May 2025 | 69,173 |
| April 2025 | 82,160 |
| March 2025 | 76,967 |
| February 2025 | 62,234 |
| January 2025 | 66,405 |
| December 2024 | 57,044 |
| November 2024 | 49,664 |
| October 2024 | 36,586 |
| September 2024 | 30,654 |
| August 2024 | 25,189 |
| July 2024 | 35,345 |
| June 2024 | 52,163 |
| May 2024 | 62,011 |
| April 2024 | 77,689 |
| March 2024 | 58,977 |
| February 2024 | 54,702 |
| January 2024 | 30,855 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Patriot Wind Farm plant, and when do they retire?
1 operable generator totals 226 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 226 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PAT1 | Operating | Onshore Wind Turbine | 226 | 2019 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Patriot Wind Farm plant?
EIA lists no joint owners for Patriot Wind Farm. Avangrid Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Patriot Wind Farm plant?
Patriot Wind Farm is in Bishop, Nueces County, Texas, at 27.5805° N, 97.6401° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Patriot Wind Farm's 226 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Electra Wind Farm | Wilbarger | 230 | 812,090 |
| Horse Creek Wind Farm | Haskell | 230 | 820,021 |
| Bruennings Breeze Wind Farm | Willacy | 228 | 524,937 |
| Patriot Wind Farm | Nueces | 226 | 668,970 |
| Griffin Trail Wind | Knox | 226 | 696,554 |
| Shamrock Wind | Crockett | 224 | 883,305 |
| Cranell Wind Farm LLC | Refugio | 220 | 551,464 |
Source: EIA Forms EIA-860 and EIA-923, 2025.