Other-fuel power plant, North Carolina

PCS Phosphate power plant, North Carolina

PCS Phosphate is a 54 MW other-fuel power plant in Beaufort County, North Carolina, operated by PCS Phosphate, and it generated 205,665 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in North Carolina, and its capacity factor sits at the 51st percentile of U.S. other-fuel plants. By 2025 generation it ranks 2,453rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

54 MWNameplate capacity
43%Capacity factor, 2025, 51st percentile, on 54 MW net summer
0.2%Of NC generation, 2025
41 yearsAverage generator age, by MW

How hard does the PCS Phosphate plant run compared with other other-fuel plants?

The PCS Phosphate plant had a capacity factor of 43% in 2025 on 54 MW of net summer capacity, the 51st percentile of the 37 U.S. other-fuel plants with at least 20 MW. The typical other-fuel plant reached 42%. That equals about 159 days at full output out of 365.

0%Shaded: the middle half of other-fuel plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
PCS Phosphate43%
Other-fuel plants, 75th percentile56%
Other-fuel plants, median42%
Other-fuel plants, 25th percentile30%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the PCS Phosphate plant generating more or less than last year?

Generation at PCS Phosphate fell 8.6% from 2024 to 2025, from 225,100 MWh to 205,665 MWh. Through August 2026 it is running 3.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024225,100
2025205,665
2026 through August128,142
2025, same months123,542
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202616,934
July 202614,100
June 202610,017
May 202617,457
April 202618,344
March 202618,411
February 202617,465
January 202615,414
December 202520,713
November 202518,238
October 202521,119
September 202522,053
August 202517,165
July 202520,899
June 202518,262
May 202519,309
April 202514,152
March 202516,778
February 20257,397
January 20259,580
December 202414,097
November 202413,069
October 202418,324
September 202419,387
August 202418,379
July 202420,813
June 20247,833
May 202426,922
April 202422,793
March 202420,067
February 202419,952
January 202423,464

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the PCS Phosphate plant?

PCS Phosphate made 0.2% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 0.1% of the state's 39,933 MW of capacity. By capacity it is the 74th largest of 928 plants in North Carolina, the 3,656th largest of 14,327 in the U.S. and the 19th largest of 71 other-fuel plants. By 2025 generation it is the 36th largest of 872 generating plants in the state.

PCS Phosphate within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)5439,9330.1%
Generation (MWh)205,665134,194,4340.2%
Other-fuel capacity (MW)5454100.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the PCS Phosphate plant, and when do they retire?

1 operable generator totals 54 MW, with an average age of 41 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s154100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingAll Other541984n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the PCS Phosphate plant?

EIA lists no joint owners for PCS Phosphate. PCS Phosphate operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the PCS Phosphate plant?

PCS Phosphate is in Aurora, Beaufort County, North Carolina, at 35.3763° N, 76.7799° W. It sits in the Duke Energy Progress East balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which North Carolina power plants are similar in size?

PCS Phosphate is the only operable other-fuel plant in North Carolina, so these are the plants of any fuel closest to its 54 MW.

Power plants in North Carolina around this size
PlantFuelCountyMW2025 MWh
Ranchland Solar, LLCSolarCurrituck6099,361
Sugar Solar, LLCSolarYadkin60110,259
Monroe Solar FacilitySolarUnion5590,941
PCS PhosphateOther-fuelBeaufort54205,665
Archer Daniels Midland SouthportNatural gasBrunswick530
Buckleberry SolarSolarLenoir5296,362
Innovative Solar 43, LLCSolarBladen5163,817

Source: EIA Forms EIA-860 and EIA-923, 2025.