Pinckneyville natural gas power plant, Illinois

Pinckneyville is a 380 MW natural gas power plant in Perry County, Illinois, operated by Union Electric Co-(MO), and it generated 66,565 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 16th percentile of U.S. natural gas plants. By 2025 generation it ranks 3,788th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

380 MWNameplate capacity
2%Capacity factor, 2025, 16th percentile, on 316 MW net summer
3,788thU.S. rank by generation, 2025
24 yearsAverage generator age, by MW

How hard does the Pinckneyville plant run compared with other natural gas plants?

The Pinckneyville plant had a capacity factor of 2% in 2025 on 316 MW of net summer capacity, the 16th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 9 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pinckneyville2%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Pinckneyville plant generating more or less than last year?

Pinckneyville generated 66,565 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 10 months, so the two years are not compared.

Net generation by period
PeriodMWh
202479,774
202566,565
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20250
November 2025212
October 20252,029
September 202512,505
August 202513,425
July 202517,982
June 202516,727
May 20253,348
April 2025123
March 2025214
February 20250
January 20250
December 2024226
November 20240
October 20240
September 202416,119
August 202428,226
July 202417,426
June 202411,796
May 20244,478
April 2024772
March 2024113
February 2024612
January 20246

Source: EIA Form EIA-923, through August 2026.

How much of Illinois' electricity comes from the Pinckneyville plant?

Pinckneyville made 0.0% of the 191,710,915 MWh reported by Illinois plants in 2025, from 0.7% of the state's 52,515 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 32nd largest of 602 plants in Illinois, the 880th largest of 14,327 in the U.S. and the 531st largest of 1,962 natural gas plants. By 2025 generation it is the 110th largest of 531 generating plants in the state.

Pinckneyville within Illinois, 2025
MeasureThis plantIllinoisShare
Capacity (MW)38052,5150.7%
Generation (MWh)66,565191,710,9150.0%
Natural gas capacity (MW)38018,7302.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Pinckneyville plant, and when do they retire?

8 operable generators total 380 MW, with an average age of 24 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s8380100%none reported
Every generator, 8 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNatural Gas Fired Combustion Turbine452000n/a
2OperatingNatural Gas Fired Combustion Turbine452000n/a
3OperatingNatural Gas Fired Combustion Turbine452000n/a
4OperatingNatural Gas Fired Combustion Turbine452000n/a
5OperatingNatural Gas Fired Combustion Turbine502001n/a
6OperatingNatural Gas Fired Combustion Turbine502001n/a
7OperatingNatural Gas Fired Combustion Turbine502001n/a
8OperatingNatural Gas Fired Combustion Turbine502001n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Pinckneyville plant?

EIA lists no joint owners for Pinckneyville. Union Electric Co-(MO) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Union Electric Co charge homes?

Union Electric Co, the operator of Pinckneyville, had an average residential price of 13.27¢ per kWh and an average bill of $137 a month in 2025 in Missouri.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Illinois
Union Electric Co13.27¢$137other state
Illinois average17.67¢$127
U.S. average17.23¢$1512% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Pinckneyville plant?

Pinckneyville is in Pinckneyville, Perry County, Illinois, at 38.1114° N, 89.3467° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Illinois are similar in size?

Illinois has 68 operable natural gas plants with 18,730 MW of capacity, and Pinckneyville's 380 MW is 2% of that.

Natural gas plants in Illinois around this size
PlantCountyMW2025 MWh
Shelby Energy CountyShelby483183,907
Raccoon Creek Energy CenterClay456-2,541
MRP Rocky Road LLCKane41633,815
PinckneyvillePerry38066,565
Invenergy Nelson Expansion LLCLee380857,927
Crete Energy Venture LLCWill35659,760
University Park SouthWill353151,438

Source: EIA Forms EIA-860 and EIA-923, 2025.