Natural gas power plant, North Dakota
Pioneer Generation Station, North Dakota
Pioneer Generation Station is a 897 MW natural gas power plant in Williams County, North Dakota, operated by Basin Electric Power Coop, and it generated 1,731,240 MWh in 2025 (Forms EIA-860 and EIA-923). That is 4.0% of the generation reported in North Dakota, and its capacity factor sits at the 55th percentile of U.S. natural gas plants. By 2025 generation it ranks 551st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does Pioneer Generation Station run compared with other natural gas plants?
Pioneer Generation Station had a capacity factor of 26% in 2025 on 763 MW of net summer capacity, the 55th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 95 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Pioneer Generation Station | 26% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is Pioneer Generation Station generating more or less than last year?
Generation at Pioneer Generation Station rose 58.5% from 2024 to 2025, from 1,092,231 MWh to 1,731,240 MWh.
| Period | MWh |
|---|---|
| 2024 | 1,092,231 |
| 2025 | 1,731,240 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 116,713 |
| November 2025 | 111,599 |
| October 2025 | 117,186 |
| September 2025 | 167,685 |
| August 2025 | 226,085 |
| July 2025 | 234,606 |
| June 2025 | 184,766 |
| May 2025 | 143,661 |
| April 2025 | 97,803 |
| March 2025 | 86,114 |
| February 2025 | 108,626 |
| January 2025 | 136,395 |
| December 2024 | 87,899 |
| November 2024 | 78,023 |
| October 2024 | 61,219 |
| September 2024 | 92,690 |
| August 2024 | 140,807 |
| July 2024 | 147,305 |
| June 2024 | 95,592 |
| May 2024 | 83,551 |
| April 2024 | 52,236 |
| March 2024 | 68,856 |
| February 2024 | 82,179 |
| January 2024 | 101,872 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at Pioneer Generation Station, and when do they retire?
23 operable generators total 897 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 15 | 293 | 33% | none reported |
| 2020s | 8 | 604 | 67% | none reported |
Every generator, 23 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 01 | Operating | Natural Gas Fired Combustion Turbine | 61 | 2013 | n/a |
| 02 | Operating | Natural Gas Fired Combustion Turbine | 61 | 2014 | n/a |
| 03 | Operating | Natural Gas Fired Combustion Turbine | 61 | 2014 | n/a |
| 11 | Operating | Natural Gas Internal Combustion Engine | 9 | 2017 | n/a |
| 12 | Operating | Natural Gas Internal Combustion Engine | 9 | 2017 | n/a |
| 13 | Operating | Natural Gas Internal Combustion Engine | 9 | 2017 | n/a |
| 14 | Operating | Natural Gas Internal Combustion Engine | 9 | 2017 | n/a |
| 15 | Operating | Natural Gas Internal Combustion Engine | 9 | 2017 | n/a |
| 16 | Operating | Natural Gas Internal Combustion Engine | 9 | 2017 | n/a |
| 17 | Operating | Natural Gas Internal Combustion Engine | 9 | 2017 | n/a |
| 18 | Operating | Natural Gas Internal Combustion Engine | 9 | 2017 | n/a |
| 19 | Operating | Natural Gas Internal Combustion Engine | 9 | 2017 | n/a |
| 20 | Operating | Natural Gas Internal Combustion Engine | 9 | 2017 | n/a |
| 21 | Operating | Natural Gas Internal Combustion Engine | 9 | 2017 | n/a |
| 22 | Operating | Natural Gas Internal Combustion Engine | 9 | 2017 | n/a |
| 04 | Operating | Natural Gas Fired Combustion Turbine | 246 | 2025 | n/a |
| 05 | Operating | Natural Gas Fired Combustion Turbine | 246 | 2025 | n/a |
| 31 | Operating | Natural Gas Internal Combustion Engine | 19 | 2025 | n/a |
| 32 | Operating | Natural Gas Internal Combustion Engine | 19 | 2025 | n/a |
| 33 | Operating | Natural Gas Internal Combustion Engine | 19 | 2025 | n/a |
| 34 | Operating | Natural Gas Internal Combustion Engine | 19 | 2025 | n/a |
| 35 | Operating | Natural Gas Internal Combustion Engine | 19 | 2025 | n/a |
| 36 | Operating | Natural Gas Internal Combustion Engine | 19 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns Pioneer Generation Station?
EIA lists no joint owners for Pioneer Generation Station. Basin Electric Power Coop operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is Pioneer Generation Station?
Pioneer Generation Station is in Williston, Williams County, North Dakota, at 48.2325° N, 103.9528° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.