Pleasant Hill PV1 is a 20 MW solar power plant in Northampton County, North Carolina, operated by Pine Gate Renewables, and it generated 39,885 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 47th percentile of U.S. solar plants. By 2025 generation it ranks 4,367th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
23%Capacity factor, 2025, 47th percentile, on 20 MW net summer
4,367thU.S. rank by generation, 2025
1 yearAverage generator age, by MW

How hard does the Pleasant Hill PV1 plant run compared with other solar plants?

The Pleasant Hill PV1 plant had a capacity factor of 23% in 2025 on 20 MW of net summer capacity, the 47th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 83 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pleasant Hill PV123%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Pleasant Hill PV1 plant generating more or less than last year?

Pleasant Hill PV1 generated 39,885 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 10 months, so the two years are not compared.

Net generation by period
PeriodMWh
202422,886
202539,885
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20251,756
November 20252,604
October 20253,105
September 20253,238
August 20253,757
July 20254,790
June 20255,029
May 20253,998
April 20253,774
March 20253,212
February 20252,124
January 20252,498
December 20241,873
November 20242,064
October 20242,691
September 20242,432
August 20244,174
July 20243,961
June 20241,915
May 20241,915
April 20241,230
March 2024631
February 20240
January 20240

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the Pleasant Hill PV1 plant?

Pleasant Hill PV1 made 0.0% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 0.1% of the state's 39,933 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 119th largest of 928 plants in North Carolina, the 4,775th largest of 14,327 in the U.S. and the 1,224th largest of 7,223 solar plants. By 2025 generation it is the 107th largest of 872 generating plants in the state.

Pleasant Hill PV1 within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)2039,9330.1%
Generation (MWh)39,885134,194,4340.0%
Solar capacity (MW)207,0250.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Pleasant Hill PV1 plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PHILLOperatingSolar Photovoltaic202024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Pleasant Hill PV1 plant?

EIA lists no joint owners for Pleasant Hill PV1. Pine Gate Renewables operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Pleasant Hill PV1 plant?

Pleasant Hill PV1 is in Pleasant Hill, Northampton County, North Carolina, at 36.5311° N, 77.5504° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in North Carolina are similar in size?

North Carolina has 757 operable solar plants with 7,025 MW of capacity, and Pleasant Hill PV1's 20 MW is 0% of that.

Solar plants in North Carolina around this size
PlantCountyMW2025 MWh
Morgan's CornerPasquotank2028,428
Cork Oak SolarHalifax2038,186
North 301 SolarHalifax2035,922
Pleasant Hill PV1Northampton2039,885
Camden Solar LLCCamden2045,101
AyrshireCleveland1935,694
Apple Data Center PV3Catawba1833,235