PPG Riverside is a 162 MW other-fuel power plant in Calcasieu Parish, Louisiana, operated by Westlake 2 US LLC, and it generated 42,126 MWh in 2025 (Forms EIA-860 and EIA-923). By 2025 generation it ranks 4,290th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

162 MWNameplate capacity
5%Capacity factor, 2025, on 103 MW net summer
4,290thU.S. rank by generation, 2025
66 yearsAverage generator age, by MW

How hard does the PPG Riverside plant run compared with other other-fuel plants?

The PPG Riverside plant had a capacity factor of 5% in 2025 on 103 MW of net summer capacity, below nearly all of the 37 U.S. other-fuel plants with at least 20 MW. The typical other-fuel plant reached 42%. That equals about 17 days at full output out of 365.

0%Shaded: the middle half of other-fuel plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
PPG Riverside5%
Other-fuel plants, 75th percentile56%
Other-fuel plants, median42%
Other-fuel plants, 25th percentile30%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the PPG Riverside plant generating more or less than last year?

PPG Riverside generated 42,126 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 354.8% ahead of the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024109,312
202542,126
2026 through August132,891
2025, same months29,218
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202619,294
July 202617,902
June 202618,396
May 202621,951
April 20264,660
March 202616,449
February 202619,077
January 202615,162
December 202512,908
November 20250
October 20250
September 20250
August 20250
July 20251,357
June 20257,102
May 202513,450
April 20257,309
March 20250
February 20250
January 20250
December 20240
November 20247,638
October 20246,375
September 2024305
August 202415,896
July 202419,709
June 202420,913
May 202422,555
April 202411,974
March 20241,531
February 2024773
January 20241,643

Source: EIA Form EIA-923, through August 2026.

How much of Louisiana's electricity comes from the PPG Riverside plant?

PPG Riverside made 0.0% of the 101,246,038 MWh reported by Louisiana plants in 2025, from 0.6% of the state's 29,230 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 35th largest of 97 plants in Louisiana, the 1,877th largest of 14,327 in the U.S. and the 2nd largest of 71 other-fuel plants. By 2025 generation it is the 72nd largest of 84 generating plants in the state.

PPG Riverside within Louisiana, 2025
MeasureThis plantLouisianaShare
Capacity (MW)16229,2300.6%
Generation (MWh)42,126101,246,0380.0%
Other-fuel capacity (MW)16252131.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the PPG Riverside plant, and when do they retire?

3 operable generators total 162 MW, with an average age of 66 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1940s13522%none reported
1950s14528%none reported
1960s18251%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1Out of serviceAll Other351947n/a
GEN2OperatingAll Other451950n/a
GEN3OperatingAll Other821969n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the PPG Riverside plant?

EIA lists no joint owners for PPG Riverside. Westlake 2 US LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the PPG Riverside plant?

PPG Riverside is in Lake Charles, Calcasieu Parish, Louisiana, at 30.2217° N, 93.2807° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).