Natural gas power plant, Kentucky
PPS Power Plant No 1 natural gas power plant, Kentucky
PPS Power Plant No 1 is a 120 MW natural gas power plant in McCracken County, Kentucky, operated by Paducah Power System, and it generated 153,508 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Kentucky, and its capacity factor sits at the 44th percentile of U.S. natural gas plants. By 2025 generation it ranks 2,863rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the PPS Power Plant No 1 plant run compared with other natural gas plants?
The PPS Power Plant No 1 plant had a capacity factor of 16% in 2025 on 110 MW of net summer capacity, the 44th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 58 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| PPS Power Plant No 1 | 16% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the PPS Power Plant No 1 plant generating more or less than last year?
Generation at PPS Power Plant No 1 rose 40.3% from 2024 to 2025, from 109,431 MWh to 153,508 MWh.
| Period | MWh |
|---|---|
| 2024 | 109,431 |
| 2025 | 153,508 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 14,729 |
| November 2025 | 12,110 |
| October 2025 | 9,524 |
| September 2025 | 12,205 |
| August 2025 | 15,791 |
| July 2025 | 18,785 |
| June 2025 | 14,376 |
| May 2025 | 10,601 |
| April 2025 | 7,181 |
| March 2025 | 7,834 |
| February 2025 | 12,789 |
| January 2025 | 17,583 |
| December 2024 | 4,505 |
| November 2024 | 117 |
| October 2024 | 2,464 |
| September 2024 | 4,607 |
| August 2024 | 24,535 |
| July 2024 | 26,065 |
| June 2024 | 24,451 |
| May 2024 | 8,869 |
| April 2024 | 4,390 |
| March 2024 | 1,664 |
| February 2024 | 1,465 |
| January 2024 | 6,301 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the PPS Power Plant No 1 plant, and when do they retire?
2 operable generators total 120 MW, with an average age of 15 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 2 | 120 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Natural Gas Fired Combustion Turbine | 60 | 2010 | n/a |
| 2 | Operating | Natural Gas Fired Combustion Turbine | 60 | 2010 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the PPS Power Plant No 1 plant?
EIA lists no joint owners for PPS Power Plant No 1. Paducah Power System operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the PPS Power Plant No 1 plant?
PPS Power Plant No 1 is in Paducah, McCracken County, Kentucky, at 37.0339° N, 88.6159° W. It sits in the Louisville Gas and Electric Company and Kentucky Utilities Company balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Kentucky are similar in size?
Kentucky has 14 operable natural gas plants with 8,363 MW of capacity, and PPS Power Plant No 1's 120 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Paddys Run | Jefferson | 211 | 66,972 |
| PPS Power Plant No 1 | McCracken | 120 | 153,508 |
| Robert A Reid | Webster | 99 | 0 |
Source: EIA Forms EIA-860 and EIA-923, 2025.