Skip to main content
RateWatt

Solar power plant, Georgia

Quitman Solar power plant, Georgia

Quitman Solar is a 150 MW solar power plant in Brooks County, Georgia, operated by Quitman Solar, LLC, and it generated 320,208 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Georgia, and its capacity factor sits at the 60th percentile of U.S. solar plants. By 2025 generation it ranks 1,884th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

150 MWNameplate capacity
24%Capacity factor, 2025, 60th percentile, on 150 MW net summer
0.2%Of GA generation, 2025
6 yearsAverage generator age, by MW

How hard does the Quitman Solar plant run compared with other solar plants?

The Quitman Solar plant had a capacity factor of 24% in 2025 on 150 MW of net summer capacity, the 60th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Quitman Solar24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Quitman Solar plant generating more or less than last year?

Generation at Quitman Solar fell 3.1% from 2024 to 2025, from 330,486 MWh to 320,208 MWh. Through August 2026 it is running 11.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024330,486
2025320,208
2026 through August240,029
2025, same months215,513
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202632,072
July 202633,830
June 202631,671
May 202630,553
April 202633,851
March 202632,604
February 202624,689
January 202620,759
December 202519,101
November 202526,459
October 202527,003
September 202532,132
August 202528,016
July 202531,711
June 202529,755
May 202528,560
April 202530,548
March 202524,261
February 202520,117
January 202522,545
December 202419,535
November 202419,140
October 202430,747
September 202421,444
August 202435,468
July 202430,191
June 202434,955
May 202432,689
April 202433,420
March 202427,746
February 202424,880
January 202420,271

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the Quitman Solar plant?

Quitman Solar made 0.2% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.4% of the state's 42,719 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 45th largest of 263 plants in Georgia, the 1,967th largest of 14,327 in the U.S. and the 263rd largest of 7,223 solar plants. By 2025 generation it is the 37th largest of 242 generating plants in the state.

Quitman Solar within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)15042,7190.4%
Generation (MWh)320,208144,967,3520.2%
Solar capacity (MW)1505,4142.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Quitman Solar plant, and when do they retire?

1 operable generator totals 150 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
QUITMOperatingSolar Photovoltaic1502019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Quitman Solar plant?

EIA lists no joint owners for Quitman Solar. Quitman Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Quitman Solar plant?

Quitman Solar is in Quitman, Brooks County, Georgia, at 30.8490° N, 83.6433° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Georgia are similar in size?

Georgia has 152 operable solar plants with 5,414 MW of capacity, and Quitman Solar's 150 MW is 3% of that.

Solar plants in Georgia around this size
PlantCountyMW2025 MWh
Hickory Park Solar HybridMitchell196435,475
Camilla Solar Energy ProjectMitchell171357,566
SR DeSoto I, LLCLee165307,713
Quitman SolarBrooks150320,208
Quitman II SolarBrooks150314,048
Washington County SolarWashington150312,217
Taylor County SolarTaylor148257,156

Source: EIA Forms EIA-860 and EIA-923, 2025.