R S Nelson coal power plant, Louisiana

R S Nelson is a 1,434 MW power plant, 615 MW of it coal, in Calcasieu Parish, Louisiana, operated by Entergy Louisiana LLC, and it generated 1,982,885 MWh in 2025 (Forms EIA-860 and EIA-923). That is 2.0% of the generation reported in Louisiana, and its capacity factor sits at the 40th percentile of U.S. coal plants. By 2025 generation it ranks 512th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,434 MWNameplate capacity
44%Capacity factor, 2025, coal units, 40th percentile, on 514 MW net summer
2.0%Of LA generation, 2025
52 yearsAverage generator age, by MW

How hard does the R S Nelson plant run compared with other coal plants?

The R S Nelson plant's coal units had a capacity factor of 44% in 2025 on 514 MW of net summer capacity, the 40th percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 160 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
R S Nelson44%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its coal generators only. Values above 105% are left out of the comparison.

Is the R S Nelson plant generating more or less than last year?

Generation at R S Nelson rose 34.4% from 2024 to 2025, from 1,475,442 MWh to 1,982,885 MWh. Through August 2026 it is running 33.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20241,475,442
20251,982,885
2026 through August1,851,784
2025, same months1,383,251
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026313,523
July 2026309,916
June 2026263,703
May 202667,627
April 202657,590
March 2026225,699
February 2026280,004
January 2026333,722
December 2025271,744
November 202555,436
October 2025144,348
September 2025128,106
August 2025260,095
July 2025235,140
June 2025223,538
May 2025292,315
April 20250
March 202518,851
February 2025112,822
January 2025240,490
December 2024156,435
November 202466,461
October 202464,197
September 2024201,471
August 202484,704
July 202487,134
June 2024233,075
May 20243,657
April 20248,006
March 2024138,922
February 2024112,857
January 2024318,523

Source: EIA Form EIA-923, through August 2026.

How much of Louisiana's electricity comes from the R S Nelson plant?

R S Nelson made 2.0% of the 101,246,038 MWh reported by Louisiana plants in 2025, from 4.9% of the state's 29,230 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 4th largest of 97 plants in Louisiana, the 153rd largest of 14,327 in the U.S. and the 103rd largest of 195 coal plants on its coal units alone. By 2025 generation it is the 18th largest of 84 generating plants in the state.

R S Nelson within Louisiana, 2025
MeasureThis plantLouisianaShare
Capacity (MW)1,43429,2304.9%
Generation (MWh)1,982,885101,246,0382.0%
Coal capacity (MW)6151,89232.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the R S Nelson plant, and when do they retire?

4 operable generators total 1,434 MW, with an average age of 52 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 163 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s222716%none reported
1970s159241%none reported
1980s161543%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingPetroleum Coke1141959n/a
2OperatingPetroleum Coke1141959n/a
4OperatingNatural Gas Steam Turbine5921970n/a
6OperatingConventional Steam Coal6151982n/a
3RetiredNatural Gas Steam Turbine16319602017

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the R S Nelson plant?

8 owners report shares in R S Nelson; Entergy Louisiana LLC holds the largest named share, 17.4% or about 250 MW. Entergy Louisiana LLC operates the plant. The listed shares add up to 58.7% of capacity; generators without joint owners are not on this list.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Entergy Louisiana LLC17.4%250345,220
Entergy Texas Inc.12.8%183252,818
CITGO Petroleum Corp7.8%112155,458
Conoco Inc & BP Amoco5.7%82113,421
EAM Nelson Holding LLC4.7%6792,601
Sam Rayburn G&T Elec Coop Inc4.3%6285,066
East Texas Electric Coop, Inc3.9%5677,333
SASOL North American Inc2.1%3042,037

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

What does Entergy Louisiana LLC charge homes?

Entergy Louisiana LLC, the operator of R S Nelson, had an average residential price of 11.90¢ per kWh and an average bill of $147 a month in 2025, 5% below the Louisiana average of 12.52¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Louisiana
Entergy Louisiana LLC11.90¢$1475% lower
Louisiana average12.52¢$153
U.S. average17.23¢$15138% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does the R S Nelson plant use?

R S Nelson has capacity on 3 fuels: 43% coal, 41% natural gas and 16% petroleum. In 2025, coal made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Coal61542.9%1,973,796
Natural gas59241.3%0
Petroleum22715.8%9,089

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the R S Nelson plant?

R S Nelson is in Westlake, Calcasieu Parish, Louisiana, at 30.2844° N, 93.2911° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).