Riverton natural gas power plant, Kansas

Riverton is a 300 MW power plant, 268 MW of it natural gas, in Cherokee County, Kansas, operated by Empire District Electric Co, and it generated 1,336,903 MWh in 2025 (Forms EIA-860 and EIA-923). That is 2.2% of the generation reported in Kansas, and its capacity factor sits at the 78th percentile of U.S. natural gas plants. By 2025 generation it ranks 627th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

300 MWNameplate capacity
61%Capacity factor, 2025, natural gas units, 78th percentile, on 252 MW net summer
2.2%Of KS generation, 2025
17 yearsAverage generator age, by MW

How hard does the Riverton plant run compared with other natural gas plants?

The Riverton plant's natural gas units had a capacity factor of 61% in 2025 on 252 MW of net summer capacity, the 78th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 221 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Riverton61%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.

Is the Riverton plant generating more or less than last year?

Riverton generated 1,336,903 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 8.6% behind the same months of 2025. 2024 has output for only 10 months, so the two years are not compared.

Net generation by period
PeriodMWh
20241,251,505
20251,336,903
2026 through August860,907
2025, same months941,613
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026140,866
July 2026162,110
June 2026128,672
May 2026100,026
April 202632,554
March 202682,376
February 202697,768
January 2026116,535
December 202578,295
November 2025113,757
October 202564,137
September 2025139,101
August 2025159,704
July 2025152,720
June 2025112,987
May 2025144,155
April 20250
March 2025102,635
February 2025123,938
January 2025145,474
December 2024156,762
November 2024158,961
October 202493,242
September 2024176,224
August 2024169,766
July 2024181,436
June 2024130,396
May 20240
April 20240
March 20241,275
February 202427,503
January 2024155,940

Source: EIA Form EIA-923, through August 2026.

How much of Kansas' electricity comes from the Riverton plant?

Riverton made 2.2% of the 61,984,540 MWh reported by Kansas plants in 2025, from 1.4% of the state's 20,969 MW of capacity. Its share of output is 1.5 times its share of capacity. By capacity it is the 16th largest of 190 plants in Kansas, the 1,044th largest of 14,327 in the U.S. and the 647th largest of 1,962 natural gas plants on its natural gas units alone. By 2025 generation it is the 7th largest of 173 generating plants in the state.

Riverton within Kansas, 2025
MeasureThis plantKansasShare
Capacity (MW)30020,9691.4%
Generation (MWh)1,336,90361,984,5402.2%
Natural gas capacity (MW)2683,8806.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Riverton plant, and when do they retire?

4 operable generators total 300 MW, with an average age of 17 years weighted by capacity at the end of 2025. 32.6 MW, 11% of operable capacity, has a planned retirement, the first in 2026. 2 more are proposed, totalling 27.2 MW. 3 have already retired, totalling 100 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s23311%2026
2000s114950%none reported
2010s111940%none reported
Capacity retiring by year
YearUnitsMW retiringShare of plant
202623311%
Every generator, 9 in all
UnitStatusTechnologyMWIn servicePlanned retirement
10OperatingPetroleum Liquids1619882026
11Out of servicePetroleum Liquids1619882026
12OperatingNatural Gas Fired Combined Cycle1492007n/a
12-2OperatingNatural Gas Fired Combined Cycle1192016n/a
13Under construction, under half builtNatural Gas Fired Combustion Turbine142026n/a
14Under construction, under half builtNatural Gas Fired Combustion Turbine142026n/a
7RetiredNatural Gas Steam Turbine3819502014
8RetiredNatural Gas Steam Turbine5019542015
9RetiredNatural Gas Fired Combustion Turbine1319642015

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Riverton plant?

EIA lists no joint owners for Riverton. Empire District Electric Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Empire District Electric Co charge homes?

Empire District Electric Co, the operator of Riverton, had an average residential price of 13.35¢ per kWh and an average bill of $142 a month in 2025, 8% below the Kansas average of 14.44¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Kansas
Empire District Electric Co13.35¢$1428% lower
Kansas average14.44¢$126
U.S. average17.23¢$15119% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does the Riverton plant use?

Riverton has capacity on 2 fuels: 89% natural gas and 11% petroleum. In 2025, natural gas made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Natural gas26889.1%1,336,654
Petroleum3310.9%249

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Riverton plant?

Riverton is in Riverton, Cherokee County, Kansas, at 37.0726° N, 94.6987° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Kansas are similar in size?

Kansas has 54 operable natural gas plants with 3,880 MW of capacity, and Riverton's 268 MW is 7% of that.

Natural gas plants in Kansas around this size
PlantCountyMW2025 MWh
West GardnerJohnson408239,230
Gordon Evans Energy CenterSedgwick375306,133
RivertonCherokee2681,336,654
Garden CityFinney25638,652
Hutchinson Energy CenterReno21413,645
Fort DodgeFord14944,028

Source: EIA Forms EIA-860 and EIA-923, 2025.