Wind power plant, Texas
Roadrunner Wind Farm, Texas
Roadrunner Wind Farm is a 256 MW wind power plant in Eastland County, Texas, operated by Roadrunner Crossing Wind Farm, LLC, and it generated 931,573 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Texas, and its capacity factor sits at the 80th percentile of U.S. wind plants. By 2025 generation it ranks 768th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Roadrunner Wind Farm plant run compared with other wind plants?
The Roadrunner Wind Farm plant had a capacity factor of 42% in 2025 on 256 MW of net summer capacity, the 80th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 152 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Roadrunner Wind Farm | 42% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Roadrunner Wind Farm plant generating more or less than last year?
Roadrunner Wind Farm generated 931,573 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 10.4% ahead of the same months of 2025. 2024 has output for only 8 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 491,749 |
| 2025 | 931,573 |
| 2026 through August | 692,415 |
| 2025, same months | 627,126 |
Monthly generation, Apr 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 78,683 |
| July 2026 | 70,846 |
| June 2026 | 102,756 |
| May 2026 | 76,769 |
| April 2026 | 96,586 |
| March 2026 | 118,710 |
| February 2026 | 74,104 |
| January 2026 | 73,961 |
| December 2025 | 89,586 |
| November 2025 | 81,935 |
| October 2025 | 83,667 |
| September 2025 | 49,259 |
| August 2025 | 56,443 |
| July 2025 | 72,497 |
| June 2025 | 87,235 |
| May 2025 | 71,789 |
| April 2025 | 89,130 |
| March 2025 | 105,736 |
| February 2025 | 71,649 |
| January 2025 | 72,647 |
| December 2024 | 69,469 |
| November 2024 | 85,542 |
| October 2024 | 83,378 |
| September 2024 | 40,691 |
| August 2024 | 69,987 |
| July 2024 | 67,215 |
| June 2024 | 74,512 |
| April 2024 | 955 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Roadrunner Wind Farm plant, and when do they retire?
1 operable generator totals 256 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 256 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 5317 | Operating | Onshore Wind Turbine | 256 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Roadrunner Wind Farm plant?
EIA lists no joint owners for Roadrunner Wind Farm. Roadrunner Crossing Wind Farm, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Roadrunner Wind Farm plant?
Roadrunner Wind Farm is in Cisco, Eastland County, Texas, at 32.4374° N, 99.1089° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Roadrunner Wind Farm's 256 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Helena Wind | Bee | 268 | 750,170 |
| Goodnight | Armstrong | 266 | 723,621 |
| Wake Wind Energy Center | Crosby | 257 | 825,715 |
| Roadrunner Wind Farm | Eastland | 256 | 931,573 |
| Dermott Wind | Scurry | 253 | 872,632 |
| Hidalgo Wind Farm LLC | Hidalgo | 250 | 815,246 |
| Willow Springs Wind Farm | Haskell | 250 | 870,633 |
Source: EIA Forms EIA-860 and EIA-923, 2025.