Wind power plant, South Dakota

Rolling Thunder Wind Farm Hybrid power plant, South Dakota

Rolling Thunder Wind Farm Hybrid is a 25.8 MW power plant, 25 MW of it wind, in Hand County, South Dakota, operated by Clearlight Energy Holdings LP, and it generated 84,223 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in South Dakota, and its capacity factor sits at the 68th percentile of U.S. wind plants. By 2025 generation it ranks 3,594th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

25.8 MWNameplate capacity
38%Capacity factor, 2025, wind units, 68th percentile, on 25 MW net summer
0.4%Of SD generation, 2025
16 yearsAverage generator age, by MW

How hard does the Rolling Thunder Wind Farm Hybrid plant run compared with other wind plants?

The Rolling Thunder Wind Farm Hybrid plant's wind units had a capacity factor of 38% in 2025 on 25 MW of net summer capacity, the 68th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 140 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Rolling Thunder Wind Farm Hybrid38%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its wind generators only. Values above 105% are left out of the comparison.

Is the Rolling Thunder Wind Farm Hybrid plant generating more or less than last year?

Generation at Rolling Thunder Wind Farm Hybrid rose 9.0% from 2024 to 2025, from 77,246 MWh to 84,223 MWh.

Net generation by period
PeriodMWh
202477,246
202584,223
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20259,233
November 20257,106
October 202510,046
September 20255,833
August 20255,665
July 20255,952
June 20255,255
May 20255,983
April 20257,226
March 20257,255
February 20255,292
January 20259,377
December 20247,168
November 20244,924
October 20245,388
September 20246,504
August 20244,892
July 20244,633
June 20246,783
May 20247,502
April 20248,562
March 20247,367
February 20246,455
January 20247,068

Source: EIA Form EIA-923, through August 2026.

How much of South Dakota's electricity comes from the Rolling Thunder Wind Farm Hybrid plant?

Rolling Thunder Wind Farm Hybrid made 0.4% of the 21,865,712 MWh reported by South Dakota plants in 2025, from 0.3% of the state's 7,670 MW of capacity. By capacity it is the 38th largest of 54 plants in South Dakota, the 4,536th largest of 14,327 in the U.S. and the 984th largest of 1,358 wind plants on its wind units alone. By 2025 generation it is the 33rd largest of 50 generating plants in the state.

Rolling Thunder Wind Farm Hybrid within South Dakota, 2025
MeasureThis plantSouth DakotaShare
Capacity (MW)267,6700.3%
Generation (MWh)84,22321,865,7120.4%
Wind capacity (MW)253,4570.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Rolling Thunder Wind Farm Hybrid plant, and when do they retire?

2 operable generators total 25.8 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s12597%none reported
2010s113%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine252009n/a
2OperatingBatteries12018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Rolling Thunder Wind Farm Hybrid plant?

EIA lists no joint owners for Rolling Thunder Wind Farm Hybrid. Clearlight Energy Holdings LP operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Rolling Thunder Wind Farm Hybrid plant use?

Rolling Thunder Wind Farm Hybrid has capacity on 2 fuels: 97% wind and 3% battery and pumped storage. In 2025, wind made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Wind2596.9%84,223
Battery and pumped storage13.1%0

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Rolling Thunder Wind Farm Hybrid plant?

Rolling Thunder Wind Farm Hybrid is in Miller, Hand County, South Dakota, at 44.4778° N, 99.1339° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in South Dakota are similar in size?

South Dakota has 25 operable wind plants with 3,457 MW of capacity, and Rolling Thunder Wind Farm Hybrid's 25 MW is 1% of that.

Wind plants in South Dakota around this size
PlantCountyMW2025 MWh
South Dakota Wind Energy CenteHyde4181,414
Rolling Thunder Wind Farm HybridHand2584,223
Aurora County WindAurora2079,811
Brule County WindBrule2079,525
Oak Tree EnergyClark2065,810

Source: EIA Forms EIA-860 and EIA-923, 2025.