Battery and pumped storage power plant, Texas
Roseland Solar Project, LLC storage power plant, Texas
Roseland Solar Project, LLC is a 51.8 MW battery and pumped storage power plant in Falls County, Texas, operated by Enel Green Power Roseland Solar, LLC, and it generated 1,034,197 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Texas. By 2025 generation it ranks 720th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
Is the Roseland Solar Project, LLC plant generating more or less than last year?
Generation at Roseland Solar Project, LLC rose 8.9% from 2024 to 2025, from 949,802 MWh to 1,034,197 MWh. Through August 2026 it is running 9.0% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 949,802 |
| 2025 | 1,034,197 |
| 2026 through August | 769,809 |
| 2025, same months | 706,429 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 121,208 |
| July 2026 | 127,280 |
| June 2026 | 107,344 |
| May 2026 | 101,563 |
| April 2026 | 72,841 |
| March 2026 | 97,480 |
| February 2026 | 77,254 |
| January 2026 | 64,839 |
| December 2025 | 52,641 |
| November 2025 | 71,980 |
| October 2025 | 94,379 |
| September 2025 | 108,768 |
| August 2025 | 113,620 |
| July 2025 | 110,850 |
| June 2025 | 118,075 |
| May 2025 | 93,831 |
| April 2025 | 67,303 |
| March 2025 | 91,234 |
| February 2025 | 57,676 |
| January 2025 | 53,840 |
| December 2024 | 48,023 |
| November 2024 | 69,348 |
| October 2024 | 97,093 |
| September 2024 | 99,423 |
| August 2024 | 111,897 |
| July 2024 | 111,177 |
| June 2024 | 108,602 |
| May 2024 | 60,835 |
| April 2024 | 60,431 |
| March 2024 | 56,636 |
| February 2024 | 68,701 |
| January 2024 | 57,636 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Roseland Solar Project, LLC plant, and when do they retire?
1 operable generator totals 51.8 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 more is proposed, totalling 500 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 52 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ROSEB | Operating | Batteries | 52 | 2023 | n/a |
| ROSES | Built, not yet operating | Solar Photovoltaic | 500 | 2026 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Roseland Solar Project, LLC plant?
Enel Kansas, LLC is the only joint owner reported for Roseland Solar Project, LLC, with 100.0%. Enel Green Power Roseland Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Roseland Solar Project, LLC plant?
Roseland Solar Project, LLC is in Riesel, Falls County, Texas, at 31.4612° N, 96.8249° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which battery and pumped storage plants in Texas are similar in size?
Texas has 178 operable battery and pumped storage plants with 11,764 MW of capacity, and Roseland Solar Project, LLC's 51.8 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Antlia | Val Verde | 70 | -3,258 |
| Lower Rio Energy Storage | Hidalgo | 60 | -1,825 |
| Cross Trails Energy Storage Project | Scurry | 58 | -3,137 |
| Roseland Solar Project, LLC | Falls | 52 | -6,569 |
| Blue Jay Solar I, LLC | Grimes | 52 | -5,810 |
| Byrd Ranch Storage | Brazoria | 50 | -4,174 |
| Tortolas | Brazoria | 50 | -3,489 |
Source: EIA Forms EIA-860 and EIA-923, 2025.