Hydro power plant, California

San Francisquito 1 hydroelectric power plant, California

San Francisquito 1 is a 65.5 MW hydro power plant in Los Angeles County, California, operated by Los Angeles Department of Water & Power, and it generated 125,416 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 17th percentile of U.S. hydro plants. By 2025 generation it ranks 3,143rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

65.5 MWNameplate capacity
19%Capacity factor, 2025, 17th percentile, on 77 MW net summer
0.1%Of CA generation, 2025
60 yearsAverage generator age, by MW

How hard does the San Francisquito 1 plant run compared with other hydro plants?

The San Francisquito 1 plant had a capacity factor of 19% in 2025 on 77 MW of net summer capacity, the 17th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 68 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
San Francisquito 119%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the San Francisquito 1 plant generating more or less than last year?

Generation at San Francisquito 1 fell 29.4% from 2024 to 2025, from 177,686 MWh to 125,416 MWh.

Net generation by period
PeriodMWh
2024177,686
2025125,416
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202514,149
November 2025533
October 20251,069
September 20259,920
August 202521,166
July 202513,819
June 202520,643
May 202521,402
April 20251,112
March 202511,012
February 202510,577
January 202514
December 20241,836
November 202413,186
October 20248,635
September 202418
August 202423,304
July 202426,421
June 202423,269
May 202419,710
April 202413,881
March 202412,118
February 202416,543
January 202418,765

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the San Francisquito 1 plant?

San Francisquito 1 made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. By capacity it is the 360th largest of 1,877 plants in California, the 3,426th largest of 14,327 in the U.S. and the 228th largest of 1,393 hydro plants. By 2025 generation it is the 323rd largest of 1,608 generating plants in the state.

San Francisquito 1 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)66107,4330.1%
Generation (MWh)125,416204,542,8980.1%
Hydro capacity (MW)669,9360.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the San Francisquito 1 plant, and when do they retire?

4 operable generators total 65.5 MW, with an average age of 60 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1910s11015%none reported
1920s11116%none reported
1980s24569%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
3OperatingConventional Hydroelectric101917n/a
4OperatingConventional Hydroelectric111923n/a
1AOperatingConventional Hydroelectric231983n/a
6OperatingConventional Hydroelectric231987n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the San Francisquito 1 plant?

EIA lists no joint owners for San Francisquito 1. Los Angeles Department of Water & Power operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Los Angeles Department of Water & Power charge homes?

Los Angeles Department of Water & Power, the operator of San Francisquito 1, had an average residential price of 26.48¢ per kWh and an average bill of $124 a month in 2025, 16% below the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
Los Angeles Department of Water & Power26.48¢$12416% lower
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the San Francisquito 1 plant?

San Francisquito 1 is in Saugus, Los Angeles County, California, at 34.5902° N, 118.4547° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in California are similar in size?

California has 238 operable hydro plants with 9,936 MW of capacity, and San Francisquito 1's 65.5 MW is 1% of that.

Hydro plants in California around this size
PlantCountyMW2025 MWh
WoodleafButte67167,140
Big Creek 2Fresno67376,585
Bucks CreekPlumas66192,023
San Francisquito 1Los Angeles66125,416
Drum 2Placer53164,163
Tiger CreekAmador52215,708
Drum 1Placer4915,101

Source: EIA Forms EIA-860 and EIA-923, 2025.