Natural gas power plant, Texas

San Jacinto County Peaking Facility, Texas

San Jacinto County Peaking Facility is a 170 MW natural gas power plant in San Jacinto County, Texas, operated by East Texas Electric Coop, Inc, and it generated 287,365 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 50th percentile of U.S. natural gas plants. By 2025 generation it ranks 2,030th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

170 MWNameplate capacity
22%Capacity factor, 2025, 50th percentile, on 146 MW net summer
2,030thU.S. rank by generation, 2025
24 yearsAverage generator age, by MW

How hard does the San Jacinto County Peaking Facility plant run compared with other natural gas plants?

The San Jacinto County Peaking Facility plant had a capacity factor of 22% in 2025 on 146 MW of net summer capacity, the 50th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 82 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
San Jacinto County Peaking Facility22%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the San Jacinto County Peaking Facility plant generating more or less than last year?

San Jacinto County Peaking Facility generated 287,365 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024139,560
2025287,365
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202518,231
November 202521,957
October 202529,711
September 202531,558
August 202543,180
July 202535,704
June 202528,936
May 202527,555
April 202516,225
March 202510,498
February 20255,497
January 202518,313
December 20242,171
November 20243,925
October 202414,304
September 202410,187
August 202419,990
July 202419,878
June 202420,666
May 202424,901
April 20247,770
March 20244,940
February 20240
January 202410,829

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the San Jacinto County Peaking Facility plant?

San Jacinto County Peaking Facility made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 375th largest of 1,023 plants in Texas, the 1,824th largest of 14,327 in the U.S. and the 759th largest of 1,962 natural gas plants. By 2025 generation it is the 397th largest of 816 generating plants in the state.

San Jacinto County Peaking Facility within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)170195,9660.1%
Generation (MWh)287,365592,896,1760.0%
Natural gas capacity (MW)17081,5740.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the San Jacinto County Peaking Facility plant, and when do they retire?

2 operable generators total 170 MW, with an average age of 24 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s2170100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SJC1OperatingNatural Gas Fired Combustion Turbine852001n/a
SJC2OperatingNatural Gas Fired Combustion Turbine852001n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the San Jacinto County Peaking Facility plant?

EIA lists no joint owners for San Jacinto County Peaking Facility. East Texas Electric Coop, Inc operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the San Jacinto County Peaking Facility plant?

San Jacinto County Peaking Facility is in Shepherd, San Jacinto County, Texas, at 30.4193° N, 95.0118° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Texas are similar in size?

Texas has 305 operable natural gas plants with 81,574 MW of capacity, and San Jacinto County Peaking Facility's 170 MW is 0% of that.

Natural gas plants in Texas around this size
PlantCountyMW2025 MWh
Timmerman Power PlantCaldwell180207,892
San Jacinto Steam Electric StationHarris176751,560
Hardin County Peaking FacilityHardin173256,789
San Jacinto County Peaking FacilitySan Jacinto170287,365
C R Wing Cogen PlantHoward170427,537
Union Carbide Seadrift CogenCalhoun168530,326
Antelope StationHale167296,567

Source: EIA Forms EIA-860 and EIA-923, 2025.