Savannah River Site Biomass Cogen is a 20.8 MW biomass power plant in Aiken County, South Carolina, operated by Ameresco, and it generated 92,628 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in South Carolina, and its capacity factor sits at the 56th percentile of U.S. biomass plants. By 2025 generation it ranks 3,483rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Savannah River Site Biomass Cogen plant run compared with other biomass plants?
The Savannah River Site Biomass Cogen plant had a capacity factor of 51% in 2025 on 19 MW of net summer capacity, the 56th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 187 days at full output out of 365.
0%Shaded: the middle half of biomass plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Savannah River Site Biomass Cogen | 51% |
| Biomass plants, 75th percentile | 65% |
| Biomass plants, median | 48% |
| Biomass plants, 25th percentile | 35% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Savannah River Site Biomass Cogen plant generating more or less than last year?
Generation at Savannah River Site Biomass Cogen rose 2.1% from 2024 to 2025, from 90,697 MWh to 92,628 MWh. Through August 2026 it is running 8.0% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 90,697 |
| 2025 | 92,628 |
| 2026 through August | 62,557 |
| 2025, same months | 57,934 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 10,050 |
| July 2026 | 9,474 |
| June 2026 | 9,422 |
| May 2026 | 3,815 |
| April 2026 | 3,711 |
| March 2026 | 8,449 |
| February 2026 | 8,386 |
| January 2026 | 9,250 |
| December 2025 | 9,358 |
| November 2025 | 9,720 |
| October 2025 | 7,399 |
| September 2025 | 8,217 |
| August 2025 | 8,896 |
| July 2025 | 9,128 |
| June 2025 | 9,556 |
| May 2025 | 847 |
| April 2025 | 4,109 |
| March 2025 | 8,871 |
| February 2025 | 8,414 |
| January 2025 | 8,113 |
| December 2024 | 8,474 |
| November 2024 | 5,145 |
| October 2024 | 6,415 |
| September 2024 | 8,684 |
| August 2024 | 8,099 |
| July 2024 | 9,521 |
| June 2024 | 9,045 |
| May 2024 | 4,984 |
| April 2024 | 4,064 |
| March 2024 | 9,535 |
| February 2024 | 8,146 |
| January 2024 | 8,585 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Savannah River Site Biomass Cogen plant, and when do they retire?
1 operable generator totals 20.8 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 21 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Wood/Wood Waste Biomass | 21 | 2012 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Savannah River Site Biomass Cogen plant?
U S Department of Energy is the only joint owner reported for Savannah River Site Biomass Cogen, with 100.0%. Ameresco operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Savannah River Site Biomass Cogen plant?
Savannah River Site Biomass Cogen is in Aiken, Aiken County, South Carolina, at 33.2833° N, 81.6667° W. It sits in the Dominion Energy South Carolina balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which biomass plants in South Carolina are similar in size?
South Carolina has 16 operable biomass plants with 491 MW of capacity, and Savannah River Site Biomass Cogen's 20.8 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Sonoco Products Co | Darlington | 38 | 57,901 |
| Allendale Biomass | Allendale | 23 | 151,301 |
| Dorchester Biomass | Dorchester | 23 | 150,039 |
| Savannah River Site Biomass Cogen | Aiken | 21 | 85,480 |
| BMW Manufacturing Co | Spartanburg | 11 | 24,943 |