Biomass power plant, South Carolina

Savannah River Site Biomass Cogen power plant, South Carolina

Savannah River Site Biomass Cogen is a 20.8 MW biomass power plant in Aiken County, South Carolina, operated by Ameresco, and it generated 92,628 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in South Carolina, and its capacity factor sits at the 56th percentile of U.S. biomass plants. By 2025 generation it ranks 3,483rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20.8 MWNameplate capacity
51%Capacity factor, 2025, 56th percentile, on 19 MW net summer
0.1%Of SC generation, 2025
13 yearsAverage generator age, by MW

How hard does the Savannah River Site Biomass Cogen plant run compared with other biomass plants?

The Savannah River Site Biomass Cogen plant had a capacity factor of 51% in 2025 on 19 MW of net summer capacity, the 56th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 187 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Savannah River Site Biomass Cogen51%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Savannah River Site Biomass Cogen plant generating more or less than last year?

Generation at Savannah River Site Biomass Cogen rose 2.1% from 2024 to 2025, from 90,697 MWh to 92,628 MWh. Through August 2026 it is running 8.0% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202490,697
202592,628
2026 through August62,557
2025, same months57,934
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202610,050
July 20269,474
June 20269,422
May 20263,815
April 20263,711
March 20268,449
February 20268,386
January 20269,250
December 20259,358
November 20259,720
October 20257,399
September 20258,217
August 20258,896
July 20259,128
June 20259,556
May 2025847
April 20254,109
March 20258,871
February 20258,414
January 20258,113
December 20248,474
November 20245,145
October 20246,415
September 20248,684
August 20248,099
July 20249,521
June 20249,045
May 20244,984
April 20244,064
March 20249,535
February 20248,146
January 20248,585

Source: EIA Form EIA-923, through August 2026.

How much of South Carolina's electricity comes from the Savannah River Site Biomass Cogen plant?

Savannah River Site Biomass Cogen made 0.1% of the 103,930,530 MWh reported by South Carolina plants in 2025, from 0.1% of the state's 27,220 MW of capacity. By capacity it is the 64th largest of 215 plants in South Carolina, the 4,757th largest of 14,327 in the U.S. and the 176th largest of 585 biomass plants. By 2025 generation it is the 47th largest of 197 generating plants in the state.

Savannah River Site Biomass Cogen within South Carolina, 2025
MeasureThis plantSouth CarolinaShare
Capacity (MW)2127,2200.1%
Generation (MWh)92,628103,930,5300.1%
Biomass capacity (MW)214914.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Savannah River Site Biomass Cogen plant, and when do they retire?

1 operable generator totals 20.8 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s121100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingWood/Wood Waste Biomass212012n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Savannah River Site Biomass Cogen plant?

U S Department of Energy is the only joint owner reported for Savannah River Site Biomass Cogen, with 100.0%. Ameresco operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Savannah River Site Biomass Cogen plant?

Savannah River Site Biomass Cogen is in Aiken, Aiken County, South Carolina, at 33.2833° N, 81.6667° W. It sits in the Dominion Energy South Carolina balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in South Carolina are similar in size?

South Carolina has 16 operable biomass plants with 491 MW of capacity, and Savannah River Site Biomass Cogen's 20.8 MW is 4% of that.

Biomass plants in South Carolina around this size
PlantCountyMW2025 MWh
Sonoco Products CoDarlington3857,901
Allendale BiomassAllendale23151,301
Dorchester BiomassDorchester23150,039
Savannah River Site Biomass CogenAiken2185,480
BMW Manufacturing CoSpartanburg1124,943

Source: EIA Forms EIA-860 and EIA-923, 2025.