Petroleum power plant, New Hampshire
Schiller petroleum power plant, New Hampshire
Schiller is a 21.2 MW petroleum power plant in Rockingham County, New Hampshire, operated by Granite Shore Power, and it generated 697 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 45th percentile of U.S. petroleum plants. By 2025 generation it ranks 12,011th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Schiller plant run compared with other petroleum plants?
The Schiller plant had a capacity factor of under 1% in 2025 on 17 MW of net summer capacity, the 45th percentile of the 143 U.S. petroleum plants with at least 20 MW. The typical petroleum plant reached 1%. It ran for only a few hours of the year at full output.
0%Shaded: the middle half of petroleum plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Schiller | under 1% |
| Petroleum plants, 75th percentile | 1% |
| Petroleum plants, median | 1% |
| Petroleum plants, 25th percentile | 0% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Schiller plant generating more or less than last year?
Schiller generated 697 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 28.1% behind the same months of 2025. 2024 has output for only 6 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 499 |
| 2025 | 697 |
| 2026 through August | 368 |
| 2025, same months | 512 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 23 |
| July 2026 | 23 |
| June 2026 | 0 |
| May 2026 | 15 |
| April 2026 | 0 |
| March 2026 | 0 |
| February 2026 | 0 |
| January 2026 | 307 |
| December 2025 | 0 |
| November 2025 | 76 |
| October 2025 | 97 |
| September 2025 | 12 |
| August 2025 | 31 |
| July 2025 | 165 |
| June 2025 | 185 |
| May 2025 | 29 |
| April 2025 | 62 |
| March 2025 | 19 |
| February 2025 | 21 |
| January 2025 | 0 |
| December 2024 | 0 |
| November 2024 | 27 |
| October 2024 | 39 |
| September 2024 | 0 |
| August 2024 | 71 |
| July 2024 | 307 |
| June 2024 | 52 |
| May 2024 | 0 |
| April 2024 | 0 |
| March 2024 | 0 |
| February 2024 | 3 |
| January 2024 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Schiller plant, and when do they retire?
1 operable generator totals 21.2 MW, with an average age of 55 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 3 have already retired, totalling 150 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1970s | 1 | 21 | 100% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GT1 | Operating | Petroleum Liquids | 21 | 1970 | n/a |
| 4 | Retired | Conventional Steam Coal | 50 | 1952 | 2025 |
| 5 | Retired | Wood/Wood Waste Biomass | 50 | 1955 | 2025 |
| 6 | Retired | Conventional Steam Coal | 50 | 1957 | 2025 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Schiller plant?
EIA lists no joint owners for Schiller. Granite Shore Power operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Schiller plant?
Schiller is in Portsmouth, Rockingham County, New Hampshire, at 43.0978° N, 70.7842° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which petroleum plants in New Hampshire are similar in size?
New Hampshire has 7 operable petroleum plants with 484 MW of capacity, and Schiller's 21.2 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Schiller | Rockingham | 21 | 697 |
| White Lake | Carroll | 19 | 594 |
| Lost Nation | Coos | 18 | 416 |
Source: EIA Forms EIA-860 and EIA-923, 2025.