Skip to main content
RateWatt

Geothermal power plant, California

Second Imperial Geothermal power plant, California

Second Imperial Geothermal is a 74.5 MW geothermal power plant in Imperial County, California, operated by ORCAL Geothermal, Inc, and it generated 275,195 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 41st percentile of U.S. geothermal plants. By 2025 generation it ranks 2,082nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
60%Capacity factor, 2025, 41st percentile, on 52.1 MW net summer
0.1%Of CA generation, 2025
9 yearsAverage generator age, by MW

How hard does the Second Imperial Geothermal plant run compared with other geothermal plants?

The Second Imperial Geothermal plant had a capacity factor of 60% in 2025 on 52.1 MW of net summer capacity, the 41st percentile of the 49 U.S. geothermal plants with at least 20 MW. The typical geothermal plant reached 66%. That equals about 220 days at full output out of 365.

0%Shaded: the middle half of geothermal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Second Imperial Geothermal60%
Geothermal plants, 75th percentile81%
Geothermal plants, median66%
Geothermal plants, 25th percentile51%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Second Imperial Geothermal plant generating more or less than last year?

Generation at Second Imperial Geothermal fell 9.0% from 2024 to 2025, from 302,329 MWh to 275,195 MWh.

Net generation by period
PeriodMWh
2024302,329
2025275,195
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202525,324
November 202524,327
October 202525,667
September 202519,552
August 202517,107
July 202522,247
June 202521,766
May 202524,827
April 202518,925
March 202524,876
February 202523,479
January 202527,098
December 202426,661
November 202427,242
October 202423,350
September 202420,209
August 202420,984
July 202420,805
June 202423,050
May 202425,525
April 202427,107
March 202428,903
February 202427,774
January 202430,719

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Second Imperial Geothermal plant?

Second Imperial Geothermal made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 1.9 times its share of capacity. By capacity it is the 341st largest of 1,877 plants in California, the 3,163rd largest of 14,327 in the U.S. and the 13th largest of 66 geothermal plants. By 2025 generation it is the 193rd largest of 1,608 generating plants in the state.

Second Imperial Geothermal within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)75107,4330.1%
Generation (MWh)275,195204,542,8980.1%
Geothermal capacity (MW)752,9362.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Second Imperial Geothermal plant, and when do they retire?

4 operable generators total 74.5 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 12 have already retired, totalling 48 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s23243%none reported
2020s24357%none reported
Every generator, 16 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GE13OperatingGeothermal162006n/a
GEN14OperatingGeothermal162008n/a
OEC1OperatingGeothermal272022n/a
OEC2OperatingGeothermal162022n/a
GE10RetiredGeothermal519932022
GE11RetiredGeothermal519932022
GE12RetiredGeothermal519932022
GEN1RetiredGeothermal419932022
GEN2RetiredGeothermal419932022
GEN3RetiredGeothermal419932022
GEN4RetiredGeothermal419932022
GEN5RetiredGeothermal419932022
GEN6RetiredGeothermal419932022
GEN7RetiredGeothermal519932022
GEN8RetiredGeothermal519932022
GEN9RetiredGeothermal519932022

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Second Imperial Geothermal plant?

2 owners report shares in Second Imperial Geothermal; Second Imperial Geothermal Company holds the largest named share, 57.0% or about 42.5 MW. ORCAL Geothermal, Inc operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Second Imperial Geothermal Company57.0%43156,999
Ormat Nevada Inc43.0%32118,196

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Second Imperial Geothermal plant?

Second Imperial Geothermal is in Heber, Imperial County, California, at 32.7144° N, 115.5356° W. It sits in the Imperial Irrigation District balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which geothermal plants in California are similar in size?

California has 32 operable geothermal plants with 2,936 MW of capacity, and Second Imperial Geothermal's 74.5 MW is 3% of that.

Geothermal plants in California around this size
PlantCountyMW2025 MWh
Coso Energy DevelopersInyo90234,957
North Brawley Geothermal PlantImperial808,392
Sonoma California GeothermalLake78435,646
Second Imperial GeothermalImperial75275,195
Salton Sea Power LLC - Unit 5Imperial58295,939
Bottle Rock PowerLake55n/a
John L. Featherstone PlantImperial55433,097

Source: EIA Forms EIA-860 and EIA-923, 2025.