Geothermal power plant, California
Second Imperial Geothermal power plant, California
Second Imperial Geothermal is a 74.5 MW geothermal power plant in Imperial County, California, operated by ORCAL Geothermal, Inc, and it generated 275,195 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 41st percentile of U.S. geothermal plants. By 2025 generation it ranks 2,082nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Second Imperial Geothermal plant run compared with other geothermal plants?
The Second Imperial Geothermal plant had a capacity factor of 60% in 2025 on 52.1 MW of net summer capacity, the 41st percentile of the 49 U.S. geothermal plants with at least 20 MW. The typical geothermal plant reached 66%. That equals about 220 days at full output out of 365.
0%Shaded: the middle half of geothermal plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Second Imperial Geothermal | 60% |
| Geothermal plants, 75th percentile | 81% |
| Geothermal plants, median | 66% |
| Geothermal plants, 25th percentile | 51% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Second Imperial Geothermal plant generating more or less than last year?
Generation at Second Imperial Geothermal fell 9.0% from 2024 to 2025, from 302,329 MWh to 275,195 MWh.
| Period | MWh |
|---|---|
| 2024 | 302,329 |
| 2025 | 275,195 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 25,324 |
| November 2025 | 24,327 |
| October 2025 | 25,667 |
| September 2025 | 19,552 |
| August 2025 | 17,107 |
| July 2025 | 22,247 |
| June 2025 | 21,766 |
| May 2025 | 24,827 |
| April 2025 | 18,925 |
| March 2025 | 24,876 |
| February 2025 | 23,479 |
| January 2025 | 27,098 |
| December 2024 | 26,661 |
| November 2024 | 27,242 |
| October 2024 | 23,350 |
| September 2024 | 20,209 |
| August 2024 | 20,984 |
| July 2024 | 20,805 |
| June 2024 | 23,050 |
| May 2024 | 25,525 |
| April 2024 | 27,107 |
| March 2024 | 28,903 |
| February 2024 | 27,774 |
| January 2024 | 30,719 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Second Imperial Geothermal plant, and when do they retire?
4 operable generators total 74.5 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 12 have already retired, totalling 48 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 2 | 32 | 43% | none reported |
| 2020s | 2 | 43 | 57% | none reported |
Every generator, 16 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GE13 | Operating | Geothermal | 16 | 2006 | n/a |
| GEN14 | Operating | Geothermal | 16 | 2008 | n/a |
| OEC1 | Operating | Geothermal | 27 | 2022 | n/a |
| OEC2 | Operating | Geothermal | 16 | 2022 | n/a |
| GE10 | Retired | Geothermal | 5 | 1993 | 2022 |
| GE11 | Retired | Geothermal | 5 | 1993 | 2022 |
| GE12 | Retired | Geothermal | 5 | 1993 | 2022 |
| GEN1 | Retired | Geothermal | 4 | 1993 | 2022 |
| GEN2 | Retired | Geothermal | 4 | 1993 | 2022 |
| GEN3 | Retired | Geothermal | 4 | 1993 | 2022 |
| GEN4 | Retired | Geothermal | 4 | 1993 | 2022 |
| GEN5 | Retired | Geothermal | 4 | 1993 | 2022 |
| GEN6 | Retired | Geothermal | 4 | 1993 | 2022 |
| GEN7 | Retired | Geothermal | 5 | 1993 | 2022 |
| GEN8 | Retired | Geothermal | 5 | 1993 | 2022 |
| GEN9 | Retired | Geothermal | 5 | 1993 | 2022 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Second Imperial Geothermal plant?
2 owners report shares in Second Imperial Geothermal; Second Imperial Geothermal Company holds the largest named share, 57.0% or about 42.5 MW. ORCAL Geothermal, Inc operates the plant.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| Second Imperial Geothermal Company | 57.0% | 43 | 156,999 |
| Ormat Nevada Inc | 43.0% | 32 | 118,196 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
Where is the Second Imperial Geothermal plant?
Second Imperial Geothermal is in Heber, Imperial County, California, at 32.7144° N, 115.5356° W. It sits in the Imperial Irrigation District balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which geothermal plants in California are similar in size?
California has 32 operable geothermal plants with 2,936 MW of capacity, and Second Imperial Geothermal's 74.5 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Coso Energy Developers | Inyo | 90 | 234,957 |
| North Brawley Geothermal Plant | Imperial | 80 | 8,392 |
| Sonoma California Geothermal | Lake | 78 | 435,646 |
| Second Imperial Geothermal | Imperial | 75 | 275,195 |
| Salton Sea Power LLC - Unit 5 | Imperial | 58 | 295,939 |
| Bottle Rock Power | Lake | 55 | n/a |
| John L. Featherstone Plant | Imperial | 55 | 433,097 |
Source: EIA Forms EIA-860 and EIA-923, 2025.