Wind power plant, Vermont
Sheffield Wind power plant, Vermont
Sheffield Wind is a 40 MW wind power plant in Caledonia County, Vermont, operated by Evergreen Wind, LLC, and it generated 68,117 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.4% of the generation reported in Vermont, and its capacity factor sits at the 10th percentile of U.S. wind plants. By 2025 generation it ranks 3,772nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Sheffield Wind plant run compared with other wind plants?
The Sheffield Wind plant had a capacity factor of 19% in 2025 on 40 MW of net summer capacity, the 10th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 71 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Sheffield Wind | 19% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Sheffield Wind plant generating more or less than last year?
Generation at Sheffield Wind fell 3.1% from 2024 to 2025, from 70,262 MWh to 68,117 MWh. Through August 2026 it is running 21.9% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 70,262 |
| 2025 | 68,117 |
| 2026 through August | 36,957 |
| 2025, same months | 47,316 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 3,296 |
| July 2026 | 4,716 |
| June 2026 | 3,198 |
| May 2026 | 5,659 |
| April 2026 | 5,937 |
| March 2026 | 6,945 |
| February 2026 | 4,425 |
| January 2026 | 2,781 |
| December 2025 | 7,156 |
| November 2025 | 4,661 |
| October 2025 | 5,884 |
| September 2025 | 3,100 |
| August 2025 | 2,503 |
| July 2025 | 3,344 |
| June 2025 | 4,459 |
| May 2025 | 5,128 |
| April 2025 | 8,658 |
| March 2025 | 9,619 |
| February 2025 | 5,860 |
| January 2025 | 7,745 |
| December 2024 | 6,732 |
| November 2024 | 9,092 |
| October 2024 | 6,689 |
| September 2024 | 4,134 |
| August 2024 | 4,835 |
| July 2024 | 3,094 |
| June 2024 | 4,422 |
| May 2024 | 4,355 |
| April 2024 | 7,236 |
| March 2024 | 9,564 |
| February 2024 | 6,408 |
| January 2024 | 3,701 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Sheffield Wind plant, and when do they retire?
1 operable generator totals 40 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 40 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 40 | 2011 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Sheffield Wind plant?
EIA lists no joint owners for Sheffield Wind. Evergreen Wind, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Sheffield Wind plant?
Sheffield Wind is in Sheffield, Caledonia County, Vermont, at 44.6760° N, 72.1013° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Vermont are similar in size?
Vermont has 5 operable wind plants with 151 MW of capacity, and Sheffield Wind's 40 MW is 26% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Kingdom Community Wind | Orleans | 65 | 179,244 |
| Sheffield Wind | Caledonia | 40 | 68,117 |
| Deerfield Wind LLC | Bennington | 30 | 96,490 |
Source: EIA Forms EIA-860 and EIA-923, 2025.