Solar power plant, Minnesota

Sherco Solar I power plant, Minnesota

Sherco Solar I is a 223 MW solar power plant in Sherburne County, Minnesota, operated by Northern States Power Co-Minnesota, and it generated 418,620 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Minnesota, and its capacity factor sits at the 36th percentile of U.S. solar plants. By 2025 generation it ranks 1,536th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

223 MWNameplate capacity
21%Capacity factor, 2025, 36th percentile, on 223 MW net summer
0.7%Of MN generation, 2025
1 yearAverage generator age, by MW

How hard does the Sherco Solar I plant run compared with other solar plants?

The Sherco Solar I plant had a capacity factor of 21% in 2025 on 223 MW of net summer capacity, the 36th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 78 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sherco Solar I21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Sherco Solar I plant generating more or less than last year?

Sherco Solar I generated 418,620 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 7.9% ahead of the same months of 2025. 2024 has output for only 3 months, so the two years are not compared.

Net generation by period
PeriodMWh
202422,956
2025418,620
2026 through August354,719
2025, same months328,751
Monthly generation, Oct 2024 to Aug 2026
MonthMWh
August 202656,715
July 202667,169
June 202659,024
May 202659,351
April 202641,378
March 202640,570
February 202615,961
January 202614,551
December 202511,694
November 20258,238
October 202528,760
September 202541,177
August 202551,888
July 202560,974
June 202545,978
May 202556,719
April 202527,579
March 202542,885
February 202531,662
January 202511,066
December 20247,579
November 202415,293
October 202484

Source: EIA Form EIA-923, through August 2026.

How much of Minnesota's electricity comes from the Sherco Solar I plant?

Sherco Solar I made 0.7% of the 58,638,010 MWh reported by Minnesota plants in 2025, from 1.1% of the state's 19,860 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 19th largest of 804 plants in Minnesota, the 1,397th largest of 14,327 in the U.S. and the 129th largest of 7,223 solar plants. By 2025 generation it is the 26th largest of 760 generating plants in the state.

Sherco Solar I within Minnesota, 2025
MeasureThis plantMinnesotaShare
Capacity (MW)22319,8601.1%
Generation (MWh)418,62058,638,0100.7%
Solar capacity (MW)2231,87411.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sherco Solar I plant, and when do they retire?

1 operable generator totals 223 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1223100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SHS01OperatingSolar Photovoltaic2232024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sherco Solar I plant?

EIA lists no joint owners for Sherco Solar I. Northern States Power Co-Minnesota operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Northern States Power Co - Minnesota charge homes?

Northern States Power Co - Minnesota, the operator of Sherco Solar I, had an average residential price of 17.07¢ per kWh and an average bill of $105 a month in 2025, 8% above the Minnesota average of 15.83¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Minnesota
Northern States Power Co - Minnesota17.07¢$1058% higher
Minnesota average15.83¢$118
U.S. average17.23¢$1519% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Sherco Solar I plant?

Sherco Solar I is in Clear Lake, Sherburne County, Minnesota, at 45.4072° N, 93.9365° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Minnesota are similar in size?

Minnesota has 540 operable solar plants with 1,874 MW of capacity, and Sherco Solar I's 223 MW is 12% of that.

Solar plants in Minnesota around this size
PlantCountyMW2025 MWh
Sherco Solar IISherburne23777,651
Sherco Solar ISherburne223418,620

Source: EIA Forms EIA-860 and EIA-923, 2025.