Natural gas power plant, Mississippi
Silver Creek natural gas power plant, Mississippi
Silver Creek is a 251 MW natural gas power plant in Jefferson Davis County, Mississippi, operated by Cooperative Energy, and it generated 282,338 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Mississippi, and its capacity factor sits at the 42nd percentile of U.S. natural gas plants. By 2025 generation it ranks 2,053rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Silver Creek plant run compared with other natural gas plants?
The Silver Creek plant had a capacity factor of 14% in 2025 on 225 MW of net summer capacity, the 42nd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 52 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Silver Creek | 14% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Silver Creek plant generating more or less than last year?
Generation at Silver Creek fell 34.0% from 2024 to 2025, from 427,708 MWh to 282,338 MWh.
| Period | MWh |
|---|---|
| 2024 | 427,708 |
| 2025 | 282,338 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 4,903 |
| November 2025 | 8,944 |
| October 2025 | 16,312 |
| September 2025 | 40,495 |
| August 2025 | 33,603 |
| July 2025 | 43,788 |
| June 2025 | 49,752 |
| May 2025 | 28,957 |
| April 2025 | 23,874 |
| March 2025 | 4,065 |
| February 2025 | 12,329 |
| January 2025 | 15,315 |
| December 2024 | 7,784 |
| November 2024 | 55,204 |
| October 2024 | 55,684 |
| September 2024 | 28,587 |
| August 2024 | 41,185 |
| July 2024 | 43,972 |
| June 2024 | 23,014 |
| May 2024 | 53,436 |
| April 2024 | 52,558 |
| March 2024 | 50,752 |
| February 2024 | 7,430 |
| January 2024 | 8,101 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Silver Creek plant, and when do they retire?
3 operable generators total 251 MW, with an average age of 21 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 3 | 251 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Natural Gas Fired Combustion Turbine | 84 | 2003 | n/a |
| 2 | Operating | Natural Gas Fired Combustion Turbine | 84 | 2004 | n/a |
| 3 | Operating | Natural Gas Fired Combustion Turbine | 84 | 2005 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Silver Creek plant?
EIA lists no joint owners for Silver Creek. Cooperative Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Silver Creek plant?
Silver Creek is in Prentiss, Jefferson Davis County, Mississippi, at 31.6004° N, 89.9468° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Mississippi are similar in size?
Mississippi has 28 operable natural gas plants with 12,678 MW of capacity, and Silver Creek's 251 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Kemper County | Kemper | 372 | 101,483 |
| Crossroads Energy Center | Coahoma | 306 | 64,694 |
| Silver Creek | Jefferson Davis | 251 | 282,338 |
| Chevron Oil | Jackson | 171 | 1,111,834 |
| Sylvarena | Smith | 141 | 262,135 |
Source: EIA Forms EIA-860 and EIA-923, 2025.