Skip to main content
RateWatt

Natural gas power plant, Alaska

Southcentral Power Project, Alaska

Southcentral Power Project is a 204 MW natural gas power plant in Anchorage, Alaska, operated by Chugach Electric Assn Inc, and it generated 1,067,596 MWh in 2025 (Forms EIA-860 and EIA-923). That is 14.2% of the generation reported in Alaska, and its capacity factor sits at the 86th percentile of U.S. natural gas plants. By 2025 generation it ranks 707th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

204 MWNameplate capacity
72%Capacity factor, 2025, 86th percentile, on 170 MW net summer
14.2%Of AK generation, 2025
12 yearsAverage generator age, by MW

How hard does the Southcentral Power Project plant run compared with other natural gas plants?

The Southcentral Power Project plant had a capacity factor of 72% in 2025 on 170 MW of net summer capacity, the 86th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 262 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Southcentral Power Project72%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Southcentral Power Project plant generating more or less than last year?

Generation at Southcentral Power Project rose 8.3% from 2024 to 2025, from 986,070 MWh to 1,067,596 MWh.

Net generation by period
PeriodMWh
2024986,070
20251,067,596
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025122,440
November 202591,117
October 202591,691
September 202571,247
August 202519,446
July 202582,049
June 202581,595
May 202596,009
April 202587,903
March 202598,304
February 2025111,328
January 2025114,467
December 202498,307
November 202494,374
October 202494,920
September 202476,766
August 202487,176
July 202483,799
June 202492,761
May 202479,411
April 202456,260
March 202468,079
February 202464,513
January 202489,704

Source: EIA Form EIA-923, through August 2026.

How much of Alaska's electricity comes from the Southcentral Power Project plant?

Southcentral Power Project made 14.2% of the 7,532,993 MWh reported by Alaska plants in 2025, from 6.5% of the state's 3,118 MW of capacity. Its share of output is 2.2 times its share of capacity. By capacity it is the 3rd largest of 150 plants in Alaska, the 1,470th largest of 14,327 in the U.S. and the 707th largest of 1,962 natural gas plants. By 2025 generation it is the 2nd largest of 127 generating plants in the state.

Southcentral Power Project within Alaska, 2025
MeasureThis plantAlaskaShare
Capacity (MW)2043,1186.5%
Generation (MWh)1,067,5967,532,99314.2%
Natural gas capacity (MW)2041,39114.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Southcentral Power Project plant, and when do they retire?

4 operable generators total 204 MW, with an average age of 12 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s4204100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNatural Gas Fired Combined Cycle492013n/a
2OperatingNatural Gas Fired Combined Cycle492013n/a
3OperatingNatural Gas Fired Combined Cycle492013n/a
4OperatingNatural Gas Fired Combined Cycle582013n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Southcentral Power Project plant?

2 owners report shares in Southcentral Power Project; Chugach Electric Assn Inc holds the largest named share, 70.0% or about 143 MW. Chugach Electric Assn Inc operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Chugach Electric Assn Inc70.0%143747,317
Anchorage Municipal Light and Power30.0%61320,279

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

What does Chugach Electric Assn Inc charge homes?

Chugach Electric Assn Inc, the operator of Southcentral Power Project, had an average residential price of 22.97¢ per kWh and an average bill of $113 a month in 2025, 12% below the Alaska average of 26.11¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Alaska
Chugach Electric Assn Inc22.97¢$11312% lower
Alaska average26.11¢$147
U.S. average17.23¢$15134% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Southcentral Power Project plant?

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Alaska are similar in size?

Alaska has 14 operable natural gas plants with 1,391 MW of capacity, and Southcentral Power Project's 204 MW is 15% of that.

Natural gas plants in Alaska around this size
PlantCountyMW2025 MWh
George M Sullivan Generation Plant 2Anchorage3471,771,617
BelugaKenai Peninsula312-3,402
Southcentral Power ProjectAnchorage2041,067,596
Eklutna Generation StationAnchorage171310,882

Source: EIA Forms EIA-860 and EIA-923, 2025.