Natural gas power plant, Alaska
Southcentral Power Project, Alaska
Southcentral Power Project is a 204 MW natural gas power plant in Anchorage, Alaska, operated by Chugach Electric Assn Inc, and it generated 1,067,596 MWh in 2025 (Forms EIA-860 and EIA-923). That is 14.2% of the generation reported in Alaska, and its capacity factor sits at the 86th percentile of U.S. natural gas plants. By 2025 generation it ranks 707th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Southcentral Power Project plant run compared with other natural gas plants?
The Southcentral Power Project plant had a capacity factor of 72% in 2025 on 170 MW of net summer capacity, the 86th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 262 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Southcentral Power Project | 72% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Southcentral Power Project plant generating more or less than last year?
Generation at Southcentral Power Project rose 8.3% from 2024 to 2025, from 986,070 MWh to 1,067,596 MWh.
| Period | MWh |
|---|---|
| 2024 | 986,070 |
| 2025 | 1,067,596 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 122,440 |
| November 2025 | 91,117 |
| October 2025 | 91,691 |
| September 2025 | 71,247 |
| August 2025 | 19,446 |
| July 2025 | 82,049 |
| June 2025 | 81,595 |
| May 2025 | 96,009 |
| April 2025 | 87,903 |
| March 2025 | 98,304 |
| February 2025 | 111,328 |
| January 2025 | 114,467 |
| December 2024 | 98,307 |
| November 2024 | 94,374 |
| October 2024 | 94,920 |
| September 2024 | 76,766 |
| August 2024 | 87,176 |
| July 2024 | 83,799 |
| June 2024 | 92,761 |
| May 2024 | 79,411 |
| April 2024 | 56,260 |
| March 2024 | 68,079 |
| February 2024 | 64,513 |
| January 2024 | 89,704 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Southcentral Power Project plant, and when do they retire?
4 operable generators total 204 MW, with an average age of 12 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 4 | 204 | 100% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Natural Gas Fired Combined Cycle | 49 | 2013 | n/a |
| 2 | Operating | Natural Gas Fired Combined Cycle | 49 | 2013 | n/a |
| 3 | Operating | Natural Gas Fired Combined Cycle | 49 | 2013 | n/a |
| 4 | Operating | Natural Gas Fired Combined Cycle | 58 | 2013 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Southcentral Power Project plant?
2 owners report shares in Southcentral Power Project; Chugach Electric Assn Inc holds the largest named share, 70.0% or about 143 MW. Chugach Electric Assn Inc operates the plant.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| Chugach Electric Assn Inc | 70.0% | 143 | 747,317 |
| Anchorage Municipal Light and Power | 30.0% | 61 | 320,279 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
What does Chugach Electric Assn Inc charge homes?
Chugach Electric Assn Inc, the operator of Southcentral Power Project, had an average residential price of 22.97¢ per kWh and an average bill of $113 a month in 2025, 12% below the Alaska average of 26.11¢.
| Measure | Price | Monthly bill | Against Alaska |
|---|---|---|---|
| Chugach Electric Assn Inc | 22.97¢ | $113 | 12% lower |
| Alaska average | 26.11¢ | $147 | |
| U.S. average | 17.23¢ | $151 | 34% lower |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the Southcentral Power Project plant?
Southcentral Power Project is in Anchorage, Anchorage, Alaska, at 61.1674° N, 149.9053° W.
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Alaska are similar in size?
Alaska has 14 operable natural gas plants with 1,391 MW of capacity, and Southcentral Power Project's 204 MW is 15% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| George M Sullivan Generation Plant 2 | Anchorage | 347 | 1,771,617 |
| Beluga | Kenai Peninsula | 312 | -3,402 |
| Southcentral Power Project | Anchorage | 204 | 1,067,596 |
| Eklutna Generation Station | Anchorage | 171 | 310,882 |
Source: EIA Forms EIA-860 and EIA-923, 2025.