Solar power plant, Indiana
Speedway Solar, LLC power plant, Indiana
Speedway Solar, LLC is a 199 MW solar power plant in Shelby County, Indiana, operated by Speedway Solar, LLC, and it generated 214,112 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Indiana, and its capacity factor sits at the 8th percentile of U.S. solar plants. By 2025 generation it ranks 2,398th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Speedway Solar, LLC plant run compared with other solar plants?
The Speedway Solar, LLC plant had a capacity factor of 12% in 2025 on 199 MW of net summer capacity, the 8th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 45 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Speedway Solar, LLC | 12% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Speedway Solar, LLC plant generating more or less than last year?
Speedway Solar, LLC generated 214,112 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 130.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 214,112 |
| 2026 through August | 308,338 |
| 2025, same months | 133,918 |
Monthly generation, Jun 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 44,385 |
| July 2026 | 51,420 |
| June 2026 | 47,519 |
| May 2026 | 44,735 |
| April 2026 | 41,696 |
| March 2026 | 34,504 |
| February 2026 | 25,113 |
| January 2026 | 18,966 |
| December 2025 | 14,422 |
| November 2025 | 17,641 |
| October 2025 | 28,032 |
| September 2025 | 20,099 |
| August 2025 | 44,151 |
| July 2025 | 48,864 |
| June 2025 | 40,903 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Speedway Solar, LLC plant, and when do they retire?
1 operable generator totals 199 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 199 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SDS | Operating | Solar Photovoltaic | 199 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Speedway Solar, LLC plant?
EIA lists no joint owners for Speedway Solar, LLC. Speedway Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Speedway Solar, LLC plant?
Speedway Solar, LLC is in Morrison Town, Shelby County, Indiana, at 39.6137° N, 85.6547° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Indiana are similar in size?
Indiana has 121 operable solar plants with 4,591 MW of capacity, and Speedway Solar, LLC's 199 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Crossroads Solar (IN) | Fountain | 200 | 5,901 |
| Gibson Solar | Gibson | 200 | 141,836 |
| Appleseed Solar | Cass | 200 | 150,379 |
| Speedway Solar, LLC | Shelby | 199 | 214,112 |
| Hardy Hills Solar Energy LLC | Clinton | 195 | 363,062 |
| Posey Solar | Posey | 191 | 269,806 |
| Bellflower Solar 1 | Henry | 153 | 255,681 |
Source: EIA Forms EIA-860 and EIA-923, 2025.