Skip to main content
RateWatt

Solar power plant, North Carolina

Speedway Solar NC, LLC power plant, North Carolina

Speedway Solar NC, LLC is a 22.6 MW solar power plant in Cabarrus County, North Carolina, operated by Deriva Energy, and it generated 39,613 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 26th percentile of U.S. solar plants. By 2025 generation it ranks 4,376th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

22.6 MWNameplate capacity
20%Capacity factor, 2025, 26th percentile, on 22.6 MW net summer
4,376thU.S. rank by generation, 2025
4 yearsAverage generator age, by MW

How hard does the Speedway Solar NC, LLC plant run compared with other solar plants?

The Speedway Solar NC, LLC plant had a capacity factor of 20% in 2025 on 22.6 MW of net summer capacity, the 26th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 73 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Speedway Solar NC, LLC20%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Speedway Solar NC, LLC plant generating more or less than last year?

Generation at Speedway Solar NC, LLC rose 17.5% from 2024 to 2025, from 33,700 MWh to 39,613 MWh.

Net generation by period
PeriodMWh
202433,700
202539,613
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,207
November 20252,846
October 20253,075
September 20254,508
August 20253,269
July 20255,304
June 20254,912
May 20253,019
April 20252,926
March 20253,434
February 20251,905
January 20252,208
December 20242,113
November 20241,823
October 20242,076
September 20242,700
August 20244,082
July 20243,289
June 20243,627
May 20243,695
April 20243,627
March 20242,743
February 20241,998
January 20241,927

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the Speedway Solar NC, LLC plant?

Speedway Solar NC, LLC made 0.0% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 0.1% of the state's 39,933 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 114th largest of 928 plants in North Carolina, the 4,661st largest of 14,327 in the U.S. and the 1,065th largest of 7,223 solar plants. By 2025 generation it is the 108th largest of 872 generating plants in the state.

Speedway Solar NC, LLC within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)2339,9330.1%
Generation (MWh)39,613134,194,4340.0%
Solar capacity (MW)237,0250.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Speedway Solar NC, LLC plant, and when do they retire?

1 operable generator totals 22.6 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s123100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingSolar Photovoltaic232021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Speedway Solar NC, LLC plant?

Speedway Solar NC, LLC is the only joint owner reported for Speedway Solar NC, LLC, with 100.0%. Deriva Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Speedway Solar NC, LLC plant?

Speedway Solar NC, LLC is in Midland, Cabarrus County, North Carolina, at 35.2180° N, 80.5360° W. It sits in the Duke Energy Carolinas balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in North Carolina are similar in size?

North Carolina has 757 operable solar plants with 7,025 MW of capacity, and Speedway Solar NC, LLC's 22.6 MW is 0% of that.

Solar plants in North Carolina around this size
PlantCountyMW2025 MWh
East Nash PV2Nash2352,978
DD Fayetteville Solar NC LLCBladen2339,433
Stony Knoll Solar, LLCSurry2343,988
Speedway Solar NC, LLCCabarrus2339,613
Ruff Solar LLCRutherford2239,501
Apple Data Center PVCatawba2129,279
Holstein PlantScotland2033,771

Source: EIA Forms EIA-860 and EIA-923, 2025.