Skip to main content
RateWatt

Natural gas power plant, Texas

Spencer natural gas power plant, Texas

Spencer is a 127 MW natural gas power plant in Denton County, Texas, operated by City of Garland-(TX), and it generated 19,674 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 14th percentile of U.S. natural gas plants. By 2025 generation it ranks 5,276th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

127 MWNameplate capacity
2%Capacity factor, 2025, 14th percentile, on 122 MW net summer
5,276thU.S. rank by generation, 2025
55 yearsAverage generator age, by MW

How hard does the Spencer plant run compared with other natural gas plants?

The Spencer plant had a capacity factor of 2% in 2025 on 122 MW of net summer capacity, the 14th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 7 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Spencer2%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Spencer plant generating more or less than last year?

Spencer generated 19,674 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 8 months, so the two years are not compared.

Net generation by period
PeriodMWh
202410,842
202519,674
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20250
November 20251,992
October 20252,182
September 20254,440
August 20255,240
July 20252,183
June 2025663
May 20252,254
April 2025720
March 20250
February 20250
January 20250
December 20240
November 20241,466
October 2024948
September 2024738
August 20244,350
July 2024298
June 20241,847
May 20241,090
April 2024105
March 20240
February 20240
January 20240

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Spencer plant?

Spencer made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 454th largest of 1,023 plants in Texas, the 2,252nd largest of 14,327 in the U.S. and the 829th largest of 1,962 natural gas plants. By 2025 generation it is the 575th largest of 816 generating plants in the state.

Spencer within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)127195,9660.1%
Generation (MWh)19,674592,896,1760.0%
Natural gas capacity (MW)12781,5740.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Spencer plant, and when do they retire?

2 operable generators total 127 MW, with an average age of 55 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 3 have already retired, totalling 47.2 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s16148%none reported
1970s16552%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
4OperatingNatural Gas Steam Turbine611966n/a
5OperatingNatural Gas Steam Turbine651973n/a
1RetiredNatural Gas Steam Turbine1319552005
2RetiredNatural Gas Steam Turbine1319552005
3RetiredNatural Gas Steam Turbine2219622005

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Spencer plant?

EIA lists no joint owners for Spencer. City of Garland-(TX) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Garland charge homes?

City of Garland, the operator of Spencer, had an average residential price of 13.68¢ per kWh and an average bill of $146 a month in 2025, 11% below the Texas average of 15.40¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Texas
City of Garland13.68¢$14611% lower
Texas average15.40¢$171
U.S. average17.23¢$15112% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Spencer plant?

Spencer is in Denton, Denton County, Texas, at 33.1975° N, 97.1061° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Texas are similar in size?

Texas has 305 operable natural gas plants with 81,574 MW of capacity, and Spencer's 127 MW is 0% of that.

Natural gas plants in Texas around this size
PlantCountyMW2025 MWh
Hal C Weaver Power PlantTravis153357,412
Power IslandBrazoria141907,806
Silas RayCameron13651,943
SpencerDenton12719,674
Friendswood EnergyHarris12245,161
Calhoun Port ComfortCalhoun12125,972
ChamonHarris12151,297

Source: EIA Forms EIA-860 and EIA-923, 2025.