Skip to main content
RateWatt

Petroleum power plant, South Dakota

Spirit Mound petroleum power plant, South Dakota

Spirit Mound is a 135 MW petroleum power plant in Clay County, South Dakota, operated by Basin Electric Power Coop, and it generated 2,350 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 29th percentile of U.S. petroleum plants. By 2025 generation it ranks 10,293rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

135 MWNameplate capacity
under 1%Capacity factor, 2025, 29th percentile, on 95 MW net summer
10,293rdU.S. rank by generation, 2025
47 yearsAverage generator age, by MW

How hard does the Spirit Mound plant run compared with other petroleum plants?

The Spirit Mound plant had a capacity factor of under 1% in 2025 on 95 MW of net summer capacity, the 29th percentile of the 143 U.S. petroleum plants with at least 20 MW. The typical petroleum plant reached 1%. It ran for only a few hours of the year at full output.

0%Shaded: the middle half of petroleum plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Spirit Moundunder 1%
Petroleum plants, 75th percentile1%
Petroleum plants, median1%
Petroleum plants, 25th percentile0%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Spirit Mound plant generating more or less than last year?

Spirit Mound generated 2,350 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 11.8% ahead of the same months of 2025. 2024 has output for only 5 months, so the two years are not compared.

Net generation by period
PeriodMWh
20244,650
20252,350
2026 through August2,287
2025, same months2,046
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026862
July 2026244
June 20260
May 20260
April 20260
March 20260
February 20260
January 20261,181
December 202572
November 20257
October 2025225
September 20250
August 2025761
July 2025978
June 20253
May 20250
April 20250
March 20250
February 2025304
January 20250
December 20240
November 20240
October 2024105
September 20240
August 20242,314
July 20241,959
June 20243
May 20240
April 20240
March 20240
February 20240
January 2024269

Source: EIA Form EIA-923, through August 2026.

How much of South Dakota's electricity comes from the Spirit Mound plant?

Spirit Mound made 0.0% of the 21,865,712 MWh reported by South Dakota plants in 2025, from 1.8% of the state's 7,670 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 22nd largest of 54 plants in South Dakota, the 2,166th largest of 14,327 in the U.S. and the 42nd largest of 861 petroleum plants. By 2025 generation it is the 45th largest of 50 generating plants in the state.

Spirit Mound within South Dakota, 2025
MeasureThis plantSouth DakotaShare
Capacity (MW)1357,6701.8%
Generation (MWh)2,35021,865,7120.0%
Petroleum capacity (MW)13524455.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Spirit Mound plant, and when do they retire?

2 operable generators total 135 MW, with an average age of 47 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s2135100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingPetroleum Liquids681978n/a
2OperatingPetroleum Liquids681978n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Spirit Mound plant?

EIA lists no joint owners for Spirit Mound. Basin Electric Power Coop operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Spirit Mound plant?

Spirit Mound is in Vermillion, Clay County, South Dakota, at 42.8977° N, 96.9905° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which petroleum plants in South Dakota are similar in size?

South Dakota has 8 operable petroleum plants with 244 MW of capacity, and Spirit Mound's 135 MW is 55% of that.

Petroleum plants in South Dakota around this size
PlantCountyMW2025 MWh
Spirit MoundClay1352,350
Watertown Power PlantCodington681,748

Source: EIA Forms EIA-860 and EIA-923, 2025.