Natural gas power plant, Missouri
State Line Combined Cycle natural gas power plant, Missouri
State Line Combined Cycle is a 691 MW natural gas power plant in Jasper County, Missouri, operated by Empire District Electric Co, and it generated 2,453,082 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.4% of the generation reported in Missouri, and its capacity factor sits at the 67th percentile of U.S. natural gas plants. By 2025 generation it ranks 446th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the State Line Combined Cycle plant run compared with other natural gas plants?
The State Line Combined Cycle plant had a capacity factor of 45% in 2025 on 627 MW of net summer capacity, the 67th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 163 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| State Line Combined Cycle | 45% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the State Line Combined Cycle plant generating more or less than last year?
Generation at State Line Combined Cycle rose 6.1% from 2024 to 2025, from 2,311,053 MWh to 2,453,082 MWh. Through August 2026 it is running 9.7% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 2,311,053 |
| 2025 | 2,453,082 |
| 2026 through August | 1,597,425 |
| 2025, same months | 1,768,414 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 316,537 |
| July 2026 | 321,680 |
| June 2026 | 218,444 |
| May 2026 | 260,656 |
| April 2026 | 172,823 |
| March 2026 | 50,855 |
| February 2026 | 104,983 |
| January 2026 | 151,447 |
| December 2025 | 101,309 |
| November 2025 | 195,955 |
| October 2025 | 240,680 |
| September 2025 | 146,724 |
| August 2025 | 320,683 |
| July 2025 | 249,588 |
| June 2025 | 262,283 |
| May 2025 | 248,332 |
| April 2025 | 304,674 |
| March 2025 | 126,924 |
| February 2025 | 97,466 |
| January 2025 | 158,464 |
| December 2024 | 121,211 |
| November 2024 | 100,879 |
| October 2024 | 20,556 |
| September 2024 | 146,591 |
| August 2024 | 319,556 |
| July 2024 | 319,479 |
| June 2024 | 276,566 |
| May 2024 | 252,611 |
| April 2024 | 143,152 |
| March 2024 | 212,995 |
| February 2024 | 169,940 |
| January 2024 | 227,517 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the State Line Combined Cycle plant, and when do they retire?
4 operable generators total 691 MW, with an average age of 26 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1990s | 2 | 303 | 44% | none reported |
| 2000s | 2 | 388 | 56% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Natural Gas Fired Combustion Turbine | 123 | 1995 | n/a |
| 2-2 | Operating | Natural Gas Fired Combined Cycle | 180 | 1997 | n/a |
| 2-1 | Operating | Natural Gas Fired Combined Cycle | 181 | 2001 | n/a |
| 2-3 | Operating | Natural Gas Fired Combined Cycle | 207 | 2001 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the State Line Combined Cycle plant?
2 owners report shares in State Line Combined Cycle; Empire District Electric Co holds the largest named share, 49.3% or about 340 MW. Empire District Electric Co operates the plant. The listed shares add up to 82.2% of capacity; generators without joint owners are not on this list.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| Empire District Electric Co | 49.3% | 340 | 1,209,615 |
| Evergy Kansas Central, Inc | 32.9% | 227 | 806,328 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
What does Empire District Electric Co charge homes?
Empire District Electric Co, the operator of State Line Combined Cycle, had an average residential price of 14.77¢ per kWh and an average bill of $154 a month in 2025, 11% above the Missouri average of 13.30¢.
| Measure | Price | Monthly bill | Against Missouri |
|---|---|---|---|
| Empire District Electric Co | 14.77¢ | $154 | 11% higher |
| Missouri average | 13.30¢ | $138 | |
| U.S. average | 17.23¢ | $151 | 30% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the State Line Combined Cycle plant?
State Line Combined Cycle is in Joplin, Jasper County, Missouri, at 37.0659° N, 94.6140° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Missouri are similar in size?
Missouri has 34 operable natural gas plants with 6,085 MW of capacity, and State Line Combined Cycle's 691 MW is 11% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Audrain Generating Station | Audrain | 814 | 402,766 |
| State Line Combined Cycle | Jasper | 691 | 2,450,822 |
| Dogwood Energy Facility | Cass | 655 | 1,986,308 |
| St Francis Energy Facility | Dunklin | 507 | 1,671,287 |
| Empire Energy Center | Jasper | 379 | 134,444 |
Source: EIA Forms EIA-860 and EIA-923, 2025.