Petroleum power plant, Florida

Stock Island petroleum power plant, Florida

Stock Island is a 127 MW petroleum power plant in Monroe County, Florida, operated by Utility Board of Key West City (FL), and it generated 6,996 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 62nd percentile of U.S. petroleum plants. By 2025 generation it ranks 7,261st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

127 MWNameplate capacity
under 1%Capacity factor, 2025, 62nd percentile, on 115 MW net summer
7,261stU.S. rank by generation, 2025
29 yearsAverage generator age, by MW

How hard does the Stock Island plant run compared with other petroleum plants?

The Stock Island plant had a capacity factor of under 1% in 2025 on 115 MW of net summer capacity, the 62nd percentile of the 143 U.S. petroleum plants with at least 20 MW. The typical petroleum plant reached 1%. It ran for only a few hours of the year at full output.

0%Shaded: the middle half of petroleum plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Stock Islandunder 1%
Petroleum plants, 75th percentile1%
Petroleum plants, median1%
Petroleum plants, 25th percentile0%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Stock Island plant generating more or less than last year?

Generation at Stock Island rose 108.6% from 2024 to 2025, from 3,353 MWh to 6,996 MWh.

Net generation by period
PeriodMWh
20243,353
20256,996
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025496
November 2025324
October 2025368
September 2025549
August 2025243
July 20251,154
June 2025512
May 2025612
April 2025316
March 2025483
February 2025207
January 20251,732
December 2024149
November 2024126
October 2024164
September 2024213
August 2024268
July 2024152
June 2024142
May 2024319
April 20241,216
March 2024182
February 2024196
January 2024224

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Stock Island plant?

Stock Island made 0.0% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.2% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 65th largest of 331 plants in Florida, the 2,252nd largest of 14,327 in the U.S. and the 46th largest of 861 petroleum plants. By 2025 generation it is the 281st largest of 313 generating plants in the state.

Stock Island within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)12779,9360.2%
Generation (MWh)6,996267,867,7350.0%
Petroleum capacity (MW)12783515.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Stock Island plant, and when do they retire?

7 operable generators total 126 MW, with an average age of 29 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 3 have already retired, totalling 7.5 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s12318%none reported
1990s45946%none reported
2000s14233%none reported
2010s132%none reported
Every generator, 10 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GT1OperatingPetroleum Liquids231978n/a
MSD1OperatingPetroleum Liquids101991n/a
MSD2OperatingPetroleum Liquids101991n/a
GT2OperatingPetroleum Liquids201999n/a
GT3OperatingPetroleum Liquids201999n/a
GT4OperatingPetroleum Liquids422006n/a
EP2OperatingPetroleum Liquids32012n/a
IC1RetiredPetroleum Liquids319652009
IC2RetiredPetroleum Liquids319652009
IC3RetiredPetroleum Liquids319652009

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Stock Island plant?

Florida Municipal Power Agency (FL) is the only joint owner reported for Stock Island, with 100.0%. Utility Board of Key West City (FL) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Stock Island plant?

Stock Island is in Stock Island, Monroe County, Florida, at 24.5633° N, 81.7342° W. It sits in the Florida Municipal Power Pool balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which petroleum plants in Florida are similar in size?

Florida has 6 operable petroleum plants with 835 MW of capacity, and Stock Island's 127 MW is 15% of that.

Petroleum plants in Florida around this size
PlantCountyMW2025 MWh
BayboroPinellas1701,266
Stock IslandMonroe1276,996

Source: EIA Forms EIA-860 and EIA-923, 2025.