Skip to main content
RateWatt

Nuclear power plant, Virginia

Surry nuclear power plant, Virginia

Surry is a 1,695 MW nuclear power plant in Surry County, Virginia, operated by Virginia Electric & Power Co, and it generated 13,218,141 MWh in 2025 (Forms EIA-860 and EIA-923). That is 12.4% of the generation reported in Virginia, and its capacity factor sits at the 26th percentile of U.S. nuclear plants. By 2025 generation it ranks 40th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,695 MWNameplate capacity
90%Capacity factor, 2025, 26th percentile, on 1,676 MW net summer
12.4%Of VA generation, 2025
53 yearsAverage generator age, by MW

How hard does the Surry plant run compared with other nuclear plants?

The Surry plant had a capacity factor of 90% in 2025 on 1,676 MW of net summer capacity, the 26th percentile of the 54 U.S. nuclear plants with at least 20 MW. The typical nuclear plant reached 95%. That equals about 329 days at full output out of 365.

0%Shaded: the middle half of nuclear plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Surry90%
Nuclear plants, 75th percentile97%
Nuclear plants, median95%
Nuclear plants, 25th percentile90%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Surry plant generating more or less than last year?

Generation at Surry rose 2.3% from 2024 to 2025, from 12,921,543 MWh to 13,218,141 MWh. Through August 2026 it is running 11.5% behind the same months of 2025.

Net generation by period
PeriodMWh
202412,921,543
202513,218,141
2026 through August8,718,484
2025, same months9,851,536
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20261,241,096
July 20261,240,979
June 20261,019,232
May 2026640,855
April 2026843,539
March 20261,274,244
February 20261,170,624
January 20261,287,915
December 2025660,218
November 2025630,831
October 2025857,569
September 20251,217,987
August 20251,157,237
July 20251,234,613
June 20251,201,825
May 20251,261,657
April 20251,236,030
March 20251,290,248
February 20251,170,385
January 20251,299,541
December 20241,139,889
November 2024625,920
October 20241,149,786
September 20241,221,316
August 20241,252,696
July 20241,245,301
June 20241,107,769
May 2024642,207
April 2024742,404
March 20241,288,642
February 20241,208,648
January 20241,296,965

Source: EIA Form EIA-923, through August 2026.

How much of Virginia's electricity comes from the Surry plant?

Surry made 12.4% of the 106,220,859 MWh reported by Virginia plants in 2025, from 5.4% of the state's 31,312 MW of capacity. Its share of output is 2.3 times its share of capacity. By capacity it is the 4th largest of 259 plants in Virginia, the 117th largest of 14,327 in the U.S. and the 33rd largest of 56 nuclear plants. By 2025 generation it is the 2nd largest of 241 generating plants in the state.

Surry within Virginia, 2025
MeasureThis plantVirginiaShare
Capacity (MW)1,69531,3125.4%
Generation (MWh)13,218,141106,220,85912.4%
Nuclear capacity (MW)1,6953,65446.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Surry plant, and when do they retire?

2 operable generators total 1,695 MW, with an average age of 53 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s21,695100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNuclear8481972n/a
2OperatingNuclear8481973n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Surry plant?

EIA lists no joint owners for Surry. Virginia Electric & Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Virginia Electric & Power Co charge homes?

Virginia Electric & Power Co, the operator of Surry, had an average residential price of 15.20¢ per kWh and an average bill of $158 a month in 2025, 1% below the Virginia average of 15.28¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Virginia
Virginia Electric & Power Co15.20¢$1581% lower
Virginia average15.28¢$163
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Surry plant?

Surry is in Surry, Surry County, Virginia, at 37.1661° N, 76.6986° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which nuclear plants in Virginia are similar in size?

Virginia has 2 operable nuclear plants with 3,654 MW of capacity, and Surry's 1,695 MW is 46% of that.

Nuclear plants in Virginia around this size
PlantCountyMW2025 MWh
North AnnaLouisa1,95914,996,064
SurrySurry1,69513,218,141

Source: EIA Forms EIA-860 and EIA-923, 2025.