Skip to main content
RateWatt

Coal power plant, Michigan

TES Filer City Station, Michigan

TES Filer City Station is a 70 MW coal power plant in Manistee County, Michigan, operated by TES Filer City Station LP, and it generated 351,278 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Michigan, and its capacity factor sits at the 37th percentile of U.S. coal plants. By 2025 generation it ranks 1,768th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

70 MWNameplate capacity
43%Capacity factor, 2025, 37th percentile, on 60 MW net summer
0.3%Of MI generation, 2025
35 yearsAverage generator age, by MW

How hard does TES Filer City Station run compared with other coal plants?

TES Filer City Station had a capacity factor of 43% in 2025 on 60 MW of net summer capacity, the 37th percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 158 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
TES Filer City Station43%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is TES Filer City Station generating more or less than last year?

Generation at TES Filer City Station rose 52.6% from 2024 to 2025, from 230,199 MWh to 351,278 MWh. Through August 2026 it is running 17.8% behind the same months of 2025.

Net generation by period
PeriodMWh
2024230,199
2025351,278
2026 through August172,854
2025, same months210,377
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202622,523
July 202623,230
June 202618,842
May 202614,476
April 202617,226
March 202619,902
February 202624,760
January 202631,895
December 202535,694
November 202537,048
October 202538,021
September 202530,138
August 202531,061
July 202539,107
June 202530,010
May 202524,267
April 202519,700
March 202523,135
February 202521,903
January 202521,194
December 202426,148
November 202420,984
October 202428,382
September 202415,355
August 202416,437
July 202420,673
June 202417,447
May 202416,346
April 202415,196
March 202415,464
February 202414,359
January 202423,408

Source: EIA Form EIA-923, through August 2026.

How much of Michigan's electricity comes from TES Filer City Station?

TES Filer City Station made 0.3% of the 127,929,498 MWh reported by Michigan plants in 2025, from 0.2% of the state's 34,725 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 70th largest of 283 plants in Michigan, the 3,346th largest of 14,327 in the U.S. and the 166th largest of 195 coal plants. By 2025 generation it is the 35th largest of 261 generating plants in the state.

TES Filer City Station within Michigan, 2025
MeasureThis plantMichiganShare
Capacity (MW)7034,7250.2%
Generation (MWh)351,278127,929,4980.3%
Coal capacity (MW)706,3141.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at TES Filer City Station, and when do they retire?

1 operable generator totals 70 MW, with an average age of 35 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s170100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingConventional Steam Coal701990n/a
GEN2CancelledNatural Gas Fired Combined Cycle253n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns TES Filer City Station?

4 owners report shares in TES Filer City Station; CMS Generation Filer City Inc holds the largest named share, 50.0% or about 35 MW. TES Filer City Station LP operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
CMS Generation Filer City Inc50.0%35175,639
Western Michigan Cogeneration LP44.0%31154,562
KCR Power Co LLC5.0%417,564
Louisiana Iron Works Inc1.0%13,513

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is TES Filer City Station?

TES Filer City Station is in Filer City, Manistee County, Michigan, at 44.2173° N, 86.2891° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.