Hydro power plant, Colorado

Tesla hydroelectric power plant, Colorado

Tesla is a 26.6 MW hydro power plant in El Paso County, Colorado, operated by City of Colorado Springs-(CO), and it generated 48,399 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Colorado, and its capacity factor sits at the 20th percentile of U.S. hydro plants. By 2025 generation it ranks 4,136th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

26.6 MWNameplate capacity
20%Capacity factor, 2025, 20th percentile, on 28 MW net summer
0.1%Of CO generation, 2025
28 yearsAverage generator age, by MW

How hard does the Tesla plant run compared with other hydro plants?

The Tesla plant had a capacity factor of 20% in 2025 on 28 MW of net summer capacity, the 20th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 72 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Tesla20%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Tesla plant generating more or less than last year?

Generation at Tesla fell 22.5% from 2024 to 2025, from 62,419 MWh to 48,399 MWh.

Net generation by period
PeriodMWh
202462,419
202548,399
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20250
November 20250
October 20252,985
September 20257,413
August 20257,880
July 20257,980
June 20255,099
May 20254,987
April 20253,867
March 20252,567
February 20252,560
January 20253,061
December 20242,785
November 20242,762
October 20245,801
September 20248,110
August 20247,798
July 20248,338
June 20248,845
May 20246,330
April 20243,475
March 20242,820
February 20242,350
January 20243,005

Source: EIA Form EIA-923, through August 2026.

How much of Colorado's electricity comes from the Tesla plant?

Tesla made 0.1% of the 55,830,894 MWh reported by Colorado plants in 2025, from 0.1% of the state's 22,712 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 93rd largest of 321 plants in Colorado, the 4,506th largest of 14,327 in the U.S. and the 390th largest of 1,393 hydro plants. By 2025 generation it is the 80th largest of 292 generating plants in the state.

Tesla within Colorado, 2025
MeasureThis plantColoradoShare
Capacity (MW)2722,7120.1%
Generation (MWh)48,39955,830,8940.1%
Hydro capacity (MW)276793.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Tesla plant, and when do they retire?

1 operable generator totals 26.6 MW, with an average age of 28 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s127100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric271997n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Tesla plant?

EIA lists no joint owners for Tesla. City of Colorado Springs-(CO) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Colorado Springs charge homes?

City of Colorado Springs, the operator of Tesla, had an average residential price of 15.43¢ per kWh and an average bill of $93 a month in 2025, 2% below the Colorado average of 15.69¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Colorado
City of Colorado Springs15.43¢$932% lower
Colorado average15.69¢$103
U.S. average17.23¢$15110% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Tesla plant?

Tesla is in Colorado Springs, El Paso County, Colorado, at 38.9737° N, 104.9011° W. It sits in the Western Area Power Administration - Rocky Mountain Region balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Colorado are similar in size?

Colorado has 47 operable hydro plants with 679 MW of capacity, and Tesla's 26.6 MW is 4% of that.

Hydro plants in Colorado around this size
PlantCountyMW2025 MWh
EstesLarimer45123,394
Pole HillLarimer38202,404
CrystalMontrose28141,252
TeslaEl Paso2748,399
Green MountainSummit2628,515
Shoshone (CO)Garfield1491,787

Source: EIA Forms EIA-860 and EIA-923, 2025.