Battery and pumped storage power plant, California

Thermalito storage power plant, California

Thermalito is a 115 MW power plant, 82.5 MW of it battery and pumped storage, in Butte County, California, operated by California Dept. of Water Resources, and it generated 322,349 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 89th percentile of U.S. battery and pumped storage plants. By 2025 generation it ranks 1,870th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

115 MWNameplate capacity
33%Capacity factor, 2025, battery and pumped storage units, 89th percentile, on 82.5 MW net summer
0.2%Of CA generation, 2025
57 yearsAverage generator age, by MW

How hard does the Thermalito plant run compared with other battery and pumped storage plants?

The Thermalito plant's battery and pumped storage units had a capacity factor of 33% in 2025 on 82.5 MW of net summer capacity, the 89th percentile of the 9 U.S. battery and pumped storage plants with at least 20 MW. The typical battery and pumped storage plant reached 6%. That equals about 121 days at full output out of 365.

0%Shaded: the middle half of battery and pumped storage plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Thermalito33%
Battery and pumped storage plants, 75th percentile14%
Battery and pumped storage plants, median6%
Battery and pumped storage plants, 25th percentile5%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its battery and pumped storage generators only. Values above 105% are left out of the comparison.

Is the Thermalito plant generating more or less than last year?

Generation at Thermalito fell 4.7% from 2024 to 2025, from 338,263 MWh to 322,349 MWh. Through August 2026 it is running 1.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024338,263
2025322,349
2026 through August235,560
2025, same months239,590
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202647,346
July 202650,725
June 202627,931
May 202614,039
April 202613,420
March 202627,017
February 202632,956
January 202622,126
December 202511,719
November 202517,295
October 202523,692
September 202530,053
August 202537,861
July 202545,114
June 202526,966
May 202517,640
April 202526,265
March 202538,471
February 202538,500
January 20258,773
December 20248,362
November 202412,566
October 202417,966
September 202441,609
August 202441,605
July 202443,677
June 202426,207
May 202436,481
April 202426,160
March 202441,785
February 202431,849
January 20249,996

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Thermalito plant?

Thermalito made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 1.5 times its share of capacity. By capacity it is the 242nd largest of 1,877 plants in California, the 2,385th largest of 14,327 in the U.S. and the 158th largest of 557 battery and pumped storage plants on its battery and pumped storage units alone. By 2025 generation it is the 153rd largest of 1,608 generating plants in the state.

Thermalito within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)115107,4330.1%
Generation (MWh)322,349204,542,8980.2%
Battery and pumped storage capacity (MW)8311,6290.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Thermalito plant, and when do they retire?

4 operable generators total 115 MW, with an average age of 57 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s4115100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric331968n/a
2OperatingHydroelectric Pumped Storage281968n/a
3OperatingHydroelectric Pumped Storage281968n/a
4OperatingHydroelectric Pumped Storage281968n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Thermalito plant?

EIA lists no joint owners for Thermalito. California Dept. of Water Resources operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Thermalito plant use?

Thermalito has capacity on 2 fuels: 72% battery and pumped storage and 28% hydro. In 2025, battery and pumped storage made 74% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Battery and pumped storage8371.7%239,752
Hydro3328.3%82,597

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Thermalito plant?

Thermalito is in Oroville, Butte County, California, at 39.5149° N, 121.6301° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which battery and pumped storage plants in California are similar in size?

California has 132 operable battery and pumped storage plants with 11,629 MW of capacity, and Thermalito's 82.5 MW is 1% of that.

Battery and pumped storage plants in California around this size
PlantCountyMW2025 MWh
Acid BESSFresno97-3,386
Placerita ESSLos Angeles88-10,913
Valley Center 85San Diego85-13,820
ThermalitoButte83239,752
AES ES Alamitos 2 LLCLos Angeles82-10,992
Johanna Energy Center, LLCOrange80-11,785
Sagebrush ESSKern80-13,783

Source: EIA Forms EIA-860 and EIA-923, 2025.