Battery and pumped storage power plant, California
Thermalito storage power plant, California
Thermalito is a 115 MW power plant, 82.5 MW of it battery and pumped storage, in Butte County, California, operated by California Dept. of Water Resources, and it generated 322,349 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 89th percentile of U.S. battery and pumped storage plants. By 2025 generation it ranks 1,870th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Thermalito plant run compared with other battery and pumped storage plants?
The Thermalito plant's battery and pumped storage units had a capacity factor of 33% in 2025 on 82.5 MW of net summer capacity, the 89th percentile of the 9 U.S. battery and pumped storage plants with at least 20 MW. The typical battery and pumped storage plant reached 6%. That equals about 121 days at full output out of 365.
0%Shaded: the middle half of battery and pumped storage plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Thermalito | 33% |
| Battery and pumped storage plants, 75th percentile | 14% |
| Battery and pumped storage plants, median | 6% |
| Battery and pumped storage plants, 25th percentile | 5% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its battery and pumped storage generators only. Values above 105% are left out of the comparison.
Is the Thermalito plant generating more or less than last year?
Generation at Thermalito fell 4.7% from 2024 to 2025, from 338,263 MWh to 322,349 MWh. Through August 2026 it is running 1.7% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 338,263 |
| 2025 | 322,349 |
| 2026 through August | 235,560 |
| 2025, same months | 239,590 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 47,346 |
| July 2026 | 50,725 |
| June 2026 | 27,931 |
| May 2026 | 14,039 |
| April 2026 | 13,420 |
| March 2026 | 27,017 |
| February 2026 | 32,956 |
| January 2026 | 22,126 |
| December 2025 | 11,719 |
| November 2025 | 17,295 |
| October 2025 | 23,692 |
| September 2025 | 30,053 |
| August 2025 | 37,861 |
| July 2025 | 45,114 |
| June 2025 | 26,966 |
| May 2025 | 17,640 |
| April 2025 | 26,265 |
| March 2025 | 38,471 |
| February 2025 | 38,500 |
| January 2025 | 8,773 |
| December 2024 | 8,362 |
| November 2024 | 12,566 |
| October 2024 | 17,966 |
| September 2024 | 41,609 |
| August 2024 | 41,605 |
| July 2024 | 43,677 |
| June 2024 | 26,207 |
| May 2024 | 36,481 |
| April 2024 | 26,160 |
| March 2024 | 41,785 |
| February 2024 | 31,849 |
| January 2024 | 9,996 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Thermalito plant, and when do they retire?
4 operable generators total 115 MW, with an average age of 57 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1960s | 4 | 115 | 100% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Conventional Hydroelectric | 33 | 1968 | n/a |
| 2 | Operating | Hydroelectric Pumped Storage | 28 | 1968 | n/a |
| 3 | Operating | Hydroelectric Pumped Storage | 28 | 1968 | n/a |
| 4 | Operating | Hydroelectric Pumped Storage | 28 | 1968 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Thermalito plant?
EIA lists no joint owners for Thermalito. California Dept. of Water Resources operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Thermalito plant use?
Thermalito has capacity on 2 fuels: 72% battery and pumped storage and 28% hydro. In 2025, battery and pumped storage made 74% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Battery and pumped storage | 83 | 71.7% | 239,752 |
| Hydro | 33 | 28.3% | 82,597 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Thermalito plant?
Thermalito is in Oroville, Butte County, California, at 39.5149° N, 121.6301° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which battery and pumped storage plants in California are similar in size?
California has 132 operable battery and pumped storage plants with 11,629 MW of capacity, and Thermalito's 82.5 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Acid BESS | Fresno | 97 | -3,386 |
| Placerita ESS | Los Angeles | 88 | -10,913 |
| Valley Center 85 | San Diego | 85 | -13,820 |
| Thermalito | Butte | 83 | 239,752 |
| AES ES Alamitos 2 LLC | Los Angeles | 82 | -10,992 |
| Johanna Energy Center, LLC | Orange | 80 | -11,785 |
| Sagebrush ESS | Kern | 80 | -13,783 |
Source: EIA Forms EIA-860 and EIA-923, 2025.