Wind power plant, Oklahoma

Traverse Wind Project, LLC power plant, Oklahoma

Traverse Wind Project, LLC is a 999 MW wind power plant in Custer County, Oklahoma, operated by Southwestern Electric Power Co, and it generated 3,104,927 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.5% of the generation reported in Oklahoma, and its capacity factor sits at the 58th percentile of U.S. wind plants. By 2025 generation it ranks 380th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

999 MWNameplate capacity
35%Capacity factor, 2025, 58th percentile, on 999 MW net summer
3.5%Of OK generation, 2025
3 yearsAverage generator age, by MW

How hard does the Traverse Wind Project, LLC plant run compared with other wind plants?

The Traverse Wind Project, LLC plant had a capacity factor of 35% in 2025 on 999 MW of net summer capacity, the 58th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 130 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Traverse Wind Project, LLC35%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Traverse Wind Project, LLC plant generating more or less than last year?

Generation at Traverse Wind Project, LLC fell 4.4% from 2024 to 2025, from 3,246,147 MWh to 3,104,927 MWh. Through August 2026 it is running 22.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20243,246,147
20253,104,927
2026 through August2,499,863
2025, same months2,044,895
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026280,532
July 2026251,822
June 2026345,110
May 2026271,433
April 2026389,154
March 2026388,582
February 2026274,365
January 2026298,865
December 2025314,801
November 2025270,442
October 2025279,977
September 2025194,812
August 2025212,482
July 2025237,643
June 2025246,283
May 2025185,530
April 2025311,222
March 2025356,276
February 2025259,566
January 2025235,893
December 2024257,004
November 2024223,638
October 2024192,738
September 2024163,698
August 2024243,260
July 2024270,546
June 2024321,894
May 2024287,313
April 2024347,325
March 2024355,530
February 2024341,586
January 2024241,615

Source: EIA Form EIA-923, through August 2026.

How much of Oklahoma's electricity comes from the Traverse Wind Project, LLC plant?

Traverse Wind Project, LLC made 3.5% of the 89,758,877 MWh reported by Oklahoma plants in 2025, from 2.8% of the state's 35,828 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 11th largest of 143 plants in Oklahoma, the 311th largest of 14,327 in the U.S. and the 2nd largest of 1,358 wind plants. By 2025 generation it is the 8th largest of 135 generating plants in the state.

Traverse Wind Project, LLC within Oklahoma, 2025
MeasureThis plantOklahomaShare
Capacity (MW)99935,8282.8%
Generation (MWh)3,104,92789,758,8773.5%
Wind capacity (MW)99913,3447.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Traverse Wind Project, LLC plant, and when do they retire?

1 operable generator totals 999 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1999100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingOnshore Wind Turbine9992022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Traverse Wind Project, LLC plant?

2 owners report shares in Traverse Wind Project, LLC; Southwestern Electric Power Co holds the largest named share, 54.5% or about 544 MW. Southwestern Electric Power Co operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Southwestern Electric Power Co54.5%5441,692,185
Public Service Co of Oklahoma45.5%4551,412,742

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

What does Southwestern Electric Power Co charge homes?

Southwestern Electric Power Co, the operator of Traverse Wind Project, LLC, had an average residential price of 13.85¢ per kWh and an average bill of $163 a month in 2025 in Louisiana.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Oklahoma
Southwestern Electric Power Co13.85¢$163other state
Oklahoma average13.21¢$141
U.S. average17.23¢$15131% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Traverse Wind Project, LLC plant?

Traverse Wind Project, LLC is in Thomas, Custer County, Oklahoma, at 35.7110° N, 98.8347° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Oklahoma are similar in size?

Oklahoma has 69 operable wind plants with 13,344 MW of capacity, and Traverse Wind Project, LLC's 999 MW is 7% of that.

Wind plants in Oklahoma around this size
PlantCountyMW2025 MWh
Traverse Wind Project, LLCCuster9993,104,927
Wagon Wheel WindLogan598181,246

Source: EIA Forms EIA-860 and EIA-923, 2025.