Solar power plant, Florida

Turnpike solar power plant, Florida

Turnpike is a 74.5 MW solar power plant in Indian River County, Florida, operated by Florida Power & Light Co, and it generated 171,115 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 73rd percentile of U.S. solar plants. By 2025 generation it ranks 2,710th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
26%Capacity factor, 2025, 73rd percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
1 yearAverage generator age, by MW

How hard does the Turnpike plant run compared with other solar plants?

The Turnpike plant had a capacity factor of 26% in 2025 on 74.5 MW of net summer capacity, the 73rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 96 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Turnpike26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Turnpike plant generating more or less than last year?

Generation at Turnpike rose 2.5% from 2024 to 2025, from 166,926 MWh to 171,115 MWh. Through August 2026 it is running 3.9% behind the same months of 2025.

Net generation by period
PeriodMWh
2024166,926
2025171,115
2026 through August117,800
2025, same months122,539
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202615,190
July 202616,545
June 202616,610
May 202617,177
April 202615,748
March 202614,411
February 202611,635
January 202610,484
December 202510,974
November 202511,911
October 202513,128
September 202512,563
August 202514,566
July 202515,658
June 202516,045
May 202517,523
April 202519,137
March 202517,908
February 202512,262
January 20259,440
December 202410,586
November 202411,040
October 202412,792
September 202413,949
August 202414,719
July 202416,675
June 202416,557
May 202419,588
April 202419,804
March 202415,484
February 202412,979
January 20242,753

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Turnpike plant?

Turnpike made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 708th largest of 7,223 solar plants. By 2025 generation it is the 110th largest of 313 generating plants in the state.

Turnpike within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)171,115267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Turnpike plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Turnpike plant?

EIA lists no joint owners for Turnpike. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Turnpike, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Turnpike plant?

Turnpike is in Vero Beach, Indian River County, Florida, at 27.5670° N, 80.6450° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Turnpike's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
White TailMartin75155,914
CaloosahatcheeHendry75153,932
MonarchMartin75143,287
TurnpikeIndian River75171,115
BeautyberryHendry75182,811
WoodyardHendry75177,619
IbisBrevard75132,837

Source: EIA Forms EIA-860 and EIA-923, 2025.