Natural gas power plant, Connecticut
UCONN Cogen Facility, Connecticut
UCONN Cogen Facility is a 25.7 MW natural gas power plant in Tolland County, Connecticut, operated by University of Connecticut, and it generated 110,500 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Connecticut, and its capacity factor sits at the 71st percentile of U.S. natural gas plants. By 2025 generation it ranks 3,288th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the UCONN Cogen Facility plant run compared with other natural gas plants?
The UCONN Cogen Facility plant had a capacity factor of 50% in 2025 on 24.6 MW of net summer capacity, the 71st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 184 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| UCONN Cogen Facility | 50% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the UCONN Cogen Facility plant generating more or less than last year?
Generation at UCONN Cogen Facility fell 10.0% from 2024 to 2025, from 122,717 MWh to 110,500 MWh. Through August 2026 it is running 1.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 122,717 |
| 2025 | 110,500 |
| 2026 through August | 80,711 |
| 2025, same months | 79,759 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 11,920 |
| July 2026 | 11,753 |
| June 2026 | 10,242 |
| May 2026 | 2,507 |
| April 2026 | 11,104 |
| March 2026 | 11,319 |
| February 2026 | 10,797 |
| January 2026 | 11,069 |
| November 2025 | 7,595 |
| October 2025 | 11,349 |
| September 2025 | 11,797 |
| August 2025 | 11,496 |
| July 2025 | 12,134 |
| June 2025 | 10,943 |
| May 2025 | 1,419 |
| April 2025 | 11,067 |
| March 2025 | 11,013 |
| February 2025 | 10,542 |
| January 2025 | 11,145 |
| December 2024 | 10,784 |
| November 2024 | 10,008 |
| October 2024 | 11,418 |
| September 2024 | 11,074 |
| August 2024 | 11,573 |
| July 2024 | 12,000 |
| June 2024 | 10,930 |
| May 2024 | 3,230 |
| April 2024 | 9,789 |
| March 2024 | 10,683 |
| February 2024 | 10,577 |
| January 2024 | 10,651 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the UCONN Cogen Facility plant, and when do they retire?
4 operable generators total 25.7 MW, with an average age of 19 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 4 | 26 | 100% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CGT1 | Operating | Natural Gas Fired Combined Cycle | 7 | 2006 | n/a |
| CGT2 | Operating | Natural Gas Fired Combined Cycle | 7 | 2006 | n/a |
| CGT3 | Operating | Natural Gas Fired Combined Cycle | 7 | 2006 | n/a |
| STG1 | Operating | Natural Gas Fired Combined Cycle | 5 | 2006 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the UCONN Cogen Facility plant?
EIA lists no joint owners for UCONN Cogen Facility. University of Connecticut operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the UCONN Cogen Facility plant?
UCONN Cogen Facility is in Storrs, Tolland County, Connecticut, at 41.8092° N, 72.2542° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Connecticut are similar in size?
Connecticut has 47 operable natural gas plants with 4,957 MW of capacity, and UCONN Cogen Facility's 25.7 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Pfizer Groton Plant | New London | 38 | 67,539 |
| Kimberly Clark-Unit 1,2,3 | Litchfield | 36 | 233,323 |
| Pratt & Whitney | Hartford | 26 | 65,917 |
| UCONN Cogen Facility | Tolland | 26 | 108,814 |
| Bridgeport Fuel Cell, LLC | Fairfield | 17 | 90,449 |
| Rand Whitney CHP Plant | New London | 17 | 133,369 |
| Foxwoods CoGen | New London | 16 | 10,834 |
Source: EIA Forms EIA-860 and EIA-923, 2025.