Skip to main content
RateWatt

Coal power plant, North Carolina

Univ of NC Chapel Hill Cogen Facility, North Carolina

Univ of NC Chapel Hill Cogen Facility is a 32 MW power plant, 28 MW of it coal, in Orange County, North Carolina, operated by University of North Carolina, and it generated 54,207 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 4th percentile of U.S. coal plants. By 2025 generation it ranks 3,992nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

32 MWNameplate capacity
11%Capacity factor, 2025, coal units, 4th percentile, on 28.7 MW net summer
3,992ndU.S. rank by generation, 2025
32 yearsAverage generator age, by MW

How hard does the Univ of NC Chapel Hill Cogen Facility plant run compared with other coal plants?

The Univ of NC Chapel Hill Cogen Facility plant's coal units had a capacity factor of 11% in 2025 on 28.7 MW of net summer capacity, the 4th percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 41 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Univ of NC Chapel Hill Cogen Facility11%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its coal generators only. Values above 105% are left out of the comparison.

Is the Univ of NC Chapel Hill Cogen Facility plant generating more or less than last year?

Univ of NC Chapel Hill Cogen Facility generated 54,207 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 7.9% behind the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.

3 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
202446,746
202554,207
2026 through August30,492
2025, same months33,100
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20263,754
July 20262,036
June 2026-1,368
May 20260
April 20262,560
March 20264,996
February 20267,798
January 202610,716
December 20255,205
November 20256,743
October 20254,975
September 20254,184
August 20252,094
July 20253,278
June 20254,157
May 2025-25
April 20252,845
March 20256,329
February 20255,584
January 20258,838
December 20247,482
November 20245,172
October 20244,391
September 20242,851
August 20243,335
July 20244,012
June 20241,614
May 2024-608
April 20242,611
March 20243,618
February 20244,909
January 20247,359

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the Univ of NC Chapel Hill Cogen Facility plant?

Univ of NC Chapel Hill Cogen Facility made 0.0% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 0.1% of the state's 39,933 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 103rd largest of 928 plants in North Carolina, the 4,301st largest of 14,327 in the U.S. and the 182nd largest of 195 coal plants on its coal units alone. By 2025 generation it is the 99th largest of 872 generating plants in the state.

Univ of NC Chapel Hill Cogen Facility within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)3239,9330.1%
Generation (MWh)54,207134,194,4340.0%
Coal capacity (MW)284,4090.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Univ of NC Chapel Hill Cogen Facility plant, and when do they retire?

3 operable generators total 32 MW, with an average age of 32 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s12888%none reported
2000s2413%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TG3OperatingConventional Steam Coal281991n/a
ES001On standbyPetroleum Liquids22007n/a
ES002On standbyPetroleum Liquids22007n/a
TG4CancelledConventional Steam Coal24n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Univ of NC Chapel Hill Cogen Facility plant?

EIA lists no joint owners for Univ of NC Chapel Hill Cogen Facility. University of North Carolina operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Univ of NC Chapel Hill Cogen Facility plant use?

Univ of NC Chapel Hill Cogen Facility has capacity on 2 fuels: 88% coal and 13% petroleum. In 2025, coal made 52% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Coal2887.5%28,450
Petroleum412.5%0

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Univ of NC Chapel Hill Cogen Facility plant?

Univ of NC Chapel Hill Cogen Facility is in Chapel Hill, Orange County, North Carolina, at 35.9069° N, 79.0617° W. It sits in the Duke Energy Carolinas balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.