Upper Gorge hydroelectric power plant, California

Upper Gorge is a 37.5 MW hydro power plant in Mono County, California, operated by Los Angeles Department of Water & Power, and it generated 51,874 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 13th percentile of U.S. hydro plants. By 2025 generation it ranks 4,054th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

37.5 MWNameplate capacity
16%Capacity factor, 2025, 13th percentile, on 36.5 MW net summer
4,054thU.S. rank by generation, 2025
72 yearsAverage generator age, by MW

How hard does the Upper Gorge plant run compared with other hydro plants?

The Upper Gorge plant had a capacity factor of 16% in 2025 on 36.5 MW of net summer capacity, the 13th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 59 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Upper Gorge16%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Upper Gorge plant generating more or less than last year?

Upper Gorge generated 51,874 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 11 months, so the two years are not compared.

3 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
202499,927
202551,874
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025-10
November 2025-9
October 2025551
September 20256,628
August 202515,522
July 202513,194
June 20259,545
May 20255,020
April 2025663
March 202525
February 2025-5
January 2025750
December 2024290
November 20243,880
October 202413,320
September 202421,430
August 202414,670
July 202413,390
June 202410,870
May 202416,400
April 20243,110
March 20240
February 2024327
January 20242,240

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Upper Gorge plant?

Upper Gorge made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 520th largest of 1,877 plants in California, the 4,181st largest of 14,327 in the U.S. and the 327th largest of 1,393 hydro plants. By 2025 generation it is the 443rd largest of 1,608 generating plants in the state.

Upper Gorge within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)38107,4330.0%
Generation (MWh)51,874204,542,8980.0%
Hydro capacity (MW)389,9360.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Upper Gorge plant, and when do they retire?

1 operable generator totals 37.5 MW, with an average age of 72 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s138100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric381953n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Upper Gorge plant?

EIA lists no joint owners for Upper Gorge. Los Angeles Department of Water & Power operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Los Angeles Department of Water & Power charge homes?

Los Angeles Department of Water & Power, the operator of Upper Gorge, had an average residential price of 26.48¢ per kWh and an average bill of $124 a month in 2025, 16% below the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
Los Angeles Department of Water & Power26.48¢$12416% lower
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Upper Gorge plant?

Upper Gorge is in Bishop, Mono County, California, at 37.5460° N, 118.5900° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in California are similar in size?

California has 238 operable hydro plants with 9,936 MW of capacity, and Upper Gorge's 37.5 MW is 0% of that.

Hydro plants in California around this size
PlantCountyMW2025 MWh
Union ValleyEl Dorado3989,140
Control GorgeInyo3846,367
Middle GorgeMono3847,994
Upper GorgeMono3851,874
Friant Hydro FacilityFresno3873,499
Pilot KnobImperial3313,354
Mojave SiphonSan Bernardino3346,067

Source: EIA Forms EIA-860 and EIA-923, 2025.