Coal power plant, Virginia

Virginia City Hybrid Energy Center, Virginia

Virginia City Hybrid Energy Center is a 668 MW coal power plant in Wise County, Virginia, operated by Virginia Electric & Power Co, and it generated 2,030,714 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.9% of the generation reported in Virginia, and its capacity factor sits at the 23rd percentile of U.S. coal plants. By 2025 generation it ranks 500th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

668 MWNameplate capacity
35%Capacity factor, 2025, 23rd percentile, on 610 MW net summer
1.9%Of VA generation, 2025
13 yearsAverage generator age, by MW

How hard does the Virginia City Hybrid Energy Center plant run compared with other coal plants?

The Virginia City Hybrid Energy Center plant had a capacity factor of 35% in 2025 on 610 MW of net summer capacity, the 23rd percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 128 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Virginia City Hybrid Energy Center35%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Virginia City Hybrid Energy Center plant generating more or less than last year?

Virginia City Hybrid Energy Center generated 2,030,714 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 4.3% ahead of the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
20241,073,012
20252,030,714
2026 through August1,158,441
2025, same months1,110,250
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026233,894
July 2026221,532
June 2026191,017
May 202638,001
April 20260
March 202616,334
February 2026225,353
January 2026232,310
December 2025224,942
November 2025277,378
October 2025335,266
September 202582,878
August 2025153,363
July 2025302,049
June 2025197,436
May 20250
April 20250
March 2025118,880
February 2025147,453
January 2025191,069
December 2024254,614
November 20247,958
October 2024136,023
September 202451,056
August 202459,412
July 2024146,594
June 2024113,206
May 202450,583
April 202467,669
March 20240
February 202463,631
January 2024122,266

Source: EIA Form EIA-923, through August 2026.

How much of Virginia's electricity comes from the Virginia City Hybrid Energy Center plant?

Virginia City Hybrid Energy Center made 1.9% of the 106,220,859 MWh reported by Virginia plants in 2025, from 2.1% of the state's 31,312 MW of capacity. By capacity it is the 14th largest of 259 plants in Virginia, the 529th largest of 14,327 in the U.S. and the 97th largest of 195 coal plants. By 2025 generation it is the 12th largest of 241 generating plants in the state.

Virginia City Hybrid Energy Center within Virginia, 2025
MeasureThis plantVirginiaShare
Capacity (MW)66831,3122.1%
Generation (MWh)2,030,714106,220,8591.9%
Coal capacity (MW)6681,51644.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Virginia City Hybrid Energy Center plant, and when do they retire?

1 operable generator totals 668 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1668100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Steam Coal6682012n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Virginia City Hybrid Energy Center plant?

EIA lists no joint owners for Virginia City Hybrid Energy Center. Virginia Electric & Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Virginia Electric & Power Co charge homes?

Virginia Electric & Power Co, the operator of Virginia City Hybrid Energy Center, had an average residential price of 15.20¢ per kWh and an average bill of $158 a month in 2025, 1% below the Virginia average of 15.28¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Virginia
Virginia Electric & Power Co15.20¢$1581% lower
Virginia average15.28¢$163
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Virginia City Hybrid Energy Center plant?

Virginia City Hybrid Energy Center is in St. Paul, Wise County, Virginia, at 36.9164° N, 82.3381° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which coal plants in Virginia are similar in size?

Virginia has 2 operable coal plants with 1,516 MW of capacity, and Virginia City Hybrid Energy Center's 668 MW is 44% of that.

Coal plants in Virginia around this size
PlantCountyMW2025 MWh
CloverHalifax8481,639,426
Virginia City Hybrid Energy CenterWise6681,868,731

Source: EIA Forms EIA-860 and EIA-923, 2025.