Hydro power plant, Pennsylvania
Wallenpaupack hydroelectric power plant, Pennsylvania
Wallenpaupack is a 40 MW hydro power plant in Wayne County, Pennsylvania, operated by Wallenpuapack Hydro, and it generated 67,322 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 15th percentile of U.S. hydro plants. By 2025 generation it ranks 3,781st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Wallenpaupack plant run compared with other hydro plants?
The Wallenpaupack plant had a capacity factor of 17% in 2025 on 44 MW of net summer capacity, the 15th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 64 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Wallenpaupack | 17% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Wallenpaupack plant generating more or less than last year?
Wallenpaupack generated 67,322 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 10 months, so the two years are not compared.
4 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.
| Period | MWh |
|---|---|
| 2024 | 86,724 |
| 2025 | 67,322 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 1,991 |
| November 2025 | -477 |
| October 2025 | -325 |
| September 2025 | 3,568 |
| August 2025 | 3,743 |
| July 2025 | 10,875 |
| June 2025 | 16,406 |
| May 2025 | 16,611 |
| April 2025 | 1,215 |
| March 2025 | 5,772 |
| February 2025 | 3,079 |
| January 2025 | 4,864 |
| December 2024 | 1,611 |
| November 2024 | -976 |
| October 2024 | -426 |
| September 2024 | 2,456 |
| August 2024 | 7,604 |
| July 2024 | 6,895 |
| June 2024 | 4,187 |
| May 2024 | 6,122 |
| April 2024 | 13,602 |
| March 2024 | 17,477 |
| February 2024 | 13,537 |
| January 2024 | 14,635 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Wallenpaupack plant, and when do they retire?
2 operable generators total 40 MW, with an average age of 99 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1920s | 2 | 40 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WP1 | Operating | Conventional Hydroelectric | 20 | 1926 | n/a |
| WP2 | Operating | Conventional Hydroelectric | 20 | 1926 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Wallenpaupack plant?
EIA lists no joint owners for Wallenpaupack. Wallenpuapack Hydro operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Wallenpaupack plant?
Wallenpaupack is in Drumore, Wayne County, Pennsylvania, at 41.4679° N, 75.1309° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Pennsylvania are similar in size?
Pennsylvania has 17 operable hydro plants with 920 MW of capacity, and Wallenpaupack's 40 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Lake Lynn Hydro Station | Fayette | 51 | 93,856 |
| Wallenpaupack | Wayne | 40 | 67,322 |
| Piney | Clarion | 30 | 62,248 |
| William F Matson Generating Station | Huntingdon | 22 | 81,189 |
Source: EIA Forms EIA-860 and EIA-923, 2025.