Wind power plant, Minnesota
Wapsipinicon Wind Project, Minnesota
Wapsipinicon Wind Project is a 101 MW wind power plant in Mower County, Minnesota, operated by EDF Renewable Asset Holdings, Inc., and it generated 268,125 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Minnesota, and its capacity factor sits at the 41st percentile of U.S. wind plants. By 2025 generation it ranks 2,124th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Wapsipinicon Wind Project plant run compared with other wind plants?
The Wapsipinicon Wind Project plant had a capacity factor of 30% in 2025 on 101 MW of net summer capacity, the 41st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 111 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Wapsipinicon Wind Project | 30% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Wapsipinicon Wind Project plant generating more or less than last year?
Generation at Wapsipinicon Wind Project rose 3.2% from 2024 to 2025, from 259,689 MWh to 268,125 MWh.
| Period | MWh |
|---|---|
| 2024 | 259,689 |
| 2025 | 268,125 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 23,551 |
| November 2025 | 24,370 |
| October 2025 | 27,188 |
| September 2025 | 13,380 |
| August 2025 | 11,064 |
| July 2025 | 11,239 |
| June 2025 | 19,786 |
| May 2025 | 19,481 |
| April 2025 | 27,601 |
| March 2025 | 28,996 |
| February 2025 | 26,800 |
| January 2025 | 34,669 |
| December 2024 | 21,828 |
| November 2024 | 29,124 |
| October 2024 | 33,425 |
| September 2024 | 17,463 |
| August 2024 | 13,600 |
| July 2024 | 10,369 |
| June 2024 | 20,060 |
| May 2024 | 20,596 |
| April 2024 | 27,636 |
| March 2024 | 26,393 |
| February 2024 | 22,846 |
| January 2024 | 16,349 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Wapsipinicon Wind Project plant, and when do they retire?
1 operable generator totals 101 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 101 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| TBD | Operating | Onshore Wind Turbine | 101 | 2009 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Wapsipinicon Wind Project plant?
EIA lists no joint owners for Wapsipinicon Wind Project. EDF Renewable Asset Holdings, Inc. operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Wapsipinicon Wind Project plant?
Wapsipinicon Wind Project is in Dexter, Mower County, Minnesota, at 43.8006° N, 92.6822° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Minnesota are similar in size?
Minnesota has 121 operable wind plants with 4,956 MW of capacity, and Wapsipinicon Wind Project's 101 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Buffalo Ridge Wind | Lincoln | 106 | 444,521 |
| Prairie Star Wind Farm | Mower | 101 | 303,349 |
| Trimont Area Wind Farm | Martin | 101 | 349,700 |
| Wapsipinicon Wind Project | Mower | 101 | 268,125 |
| Grand Meadow | Mower | 101 | 378,700 |
| Lake Benton II | Pipestone | 100 | 439,952 |
| Stoneray Power Partners, LLC | Pipestone | 100 | 376,955 |
Source: EIA Forms EIA-860 and EIA-923, 2025.