Natural gas power plant, Georgia
Washington County Power LLC natural gas power plant, Georgia
Washington County Power LLC is a 796 MW natural gas power plant in Washington County, Georgia, operated by CAMS (Georgia) Washington County Power, and it generated 504,287 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Georgia, and its capacity factor sits at the 34th percentile of U.S. natural gas plants. By 2025 generation it ranks 1,325th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Washington County Power LLC plant run compared with other natural gas plants?
The Washington County Power LLC plant had a capacity factor of 9% in 2025 on 623 MW of net summer capacity, the 34th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 34 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Washington County Power LLC | 9% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Washington County Power LLC plant generating more or less than last year?
Generation at Washington County Power LLC rose 192.5% from 2024 to 2025, from 172,392 MWh to 504,287 MWh.
| Period | MWh |
|---|---|
| 2024 | 172,392 |
| 2025 | 504,287 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 23,961 |
| November 2025 | 6,149 |
| October 2025 | 168 |
| September 2025 | 35,884 |
| August 2025 | 73,761 |
| July 2025 | 172,748 |
| June 2025 | 77,798 |
| May 2025 | 41,510 |
| April 2025 | 33,010 |
| March 2025 | 0 |
| February 2025 | 4,013 |
| January 2025 | 35,285 |
| December 2024 | 14,313 |
| November 2024 | 13,071 |
| October 2024 | 13,742 |
| September 2024 | 14,553 |
| August 2024 | 17,934 |
| July 2024 | 18,025 |
| June 2024 | 15,112 |
| May 2024 | 13,539 |
| April 2024 | 11,146 |
| March 2024 | 11,258 |
| February 2024 | 13,775 |
| January 2024 | 15,924 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Washington County Power LLC plant, and when do they retire?
4 operable generators total 796 MW, with an average age of 22 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 4 | 796 | 100% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Natural Gas Fired Combustion Turbine | 199 | 2003 | n/a |
| 2 | Operating | Natural Gas Fired Combustion Turbine | 199 | 2003 | n/a |
| 3 | Operating | Natural Gas Fired Combustion Turbine | 199 | 2003 | n/a |
| 4 | Operating | Natural Gas Fired Combustion Turbine | 199 | 2003 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Washington County Power LLC plant?
2 owners report shares in Washington County Power LLC; Oglethorpe Power Corporation holds the largest named share, 50.0% or about 398 MW. CAMS (Georgia) Washington County Power operates the plant.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| Oglethorpe Power Corporation | 50.0% | 398 | 252,144 |
| Georgia Gulf Generating, LLC | 50.0% | 398 | 252,144 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
Where is the Washington County Power LLC plant?
Washington County Power LLC is in Sandersville, Washington County, Georgia, at 33.0922° N, 82.9800° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Georgia are similar in size?
Georgia has 30 operable natural gas plants with 18,466 MW of capacity, and Washington County Power LLC's 796 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Dahlberg | Jackson | 919 | 266,946 |
| McIntosh | Effingham | 810 | 25,442 |
| Yates | Coweta | 807 | 1,187,177 |
| Washington County Power LLC | Washington | 796 | 504,287 |
| Talbot County Energy | Talbot | 726 | 399,690 |
| Edward L. Addison Generating Plant | Upson | 701 | 304,073 |
| AL Sandersville LLC | Washington | 692 | 326,170 |
Source: EIA Forms EIA-860 and EIA-923, 2025.