Natural gas power plant, Connecticut
Waterbury Generation natural gas power plant, Connecticut
Waterbury Generation is a 96 MW natural gas power plant in New Haven County, Connecticut, operated by Engie North America, and it generated 54,967 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Connecticut, and its capacity factor sits at the 28th percentile of U.S. natural gas plants. By 2025 generation it ranks 3,977th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Waterbury Generation plant run compared with other natural gas plants?
The Waterbury Generation plant had a capacity factor of 6% in 2025 on 96 MW of net summer capacity, the 28th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 24 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Waterbury Generation | 6% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Waterbury Generation plant generating more or less than last year?
Generation at Waterbury Generation rose 25.6% from 2024 to 2025, from 43,778 MWh to 54,967 MWh.
| Period | MWh |
|---|---|
| 2024 | 43,778 |
| 2025 | 54,967 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 1,068 |
| November 2025 | 6,705 |
| October 2025 | 6,777 |
| September 2025 | 4,887 |
| August 2025 | 7,481 |
| July 2025 | 9,553 |
| June 2025 | 6,879 |
| May 2025 | 3,521 |
| April 2025 | 3,611 |
| March 2025 | 3,100 |
| February 2025 | 766 |
| January 2025 | 619 |
| December 2024 | 334 |
| November 2024 | 4,985 |
| October 2024 | 5,997 |
| September 2024 | 3,787 |
| August 2024 | 3,742 |
| July 2024 | 9,298 |
| June 2024 | 3,247 |
| May 2024 | 3,790 |
| April 2024 | 3,217 |
| March 2024 | 2,780 |
| February 2024 | 1,589 |
| January 2024 | 1,012 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Waterbury Generation plant, and when do they retire?
1 operable generator totals 96 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 96 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 10 | Operating | Natural Gas Fired Combustion Turbine | 96 | 2009 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Waterbury Generation plant?
Waterbury Generation LLC is the only joint owner reported for Waterbury Generation, with 100.0%. Engie North America operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Waterbury Generation plant?
Waterbury Generation is in Waterbury, New Haven County, Connecticut, at 41.5444° N, 73.0417° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Connecticut are similar in size?
Connecticut has 47 operable natural gas plants with 4,957 MW of capacity, and Waterbury Generation's 96 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Waterbury Generation | New Haven | 96 | 54,460 |
| A L Pierce | New Haven | 84 | 0 |
| Algonquin Windsor Locks | Hartford | 71 | 135,771 |
Source: EIA Forms EIA-860 and EIA-923, 2025.