Hydro power plant, California
White Rock/Slab Creek hydroelectric power plant, California
White Rock/Slab Creek is a 269 MW hydro power plant in El Dorado County, California, operated by Sacramento Municipal Util Dist, and it generated 449,060 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 23rd percentile of U.S. hydro plants. By 2025 generation it ranks 1,456th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the White Rock/Slab Creek plant run compared with other hydro plants?
The White Rock/Slab Creek plant had a capacity factor of 21% in 2025 on 244 MW of net summer capacity, the 23rd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 77 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| White Rock/Slab Creek | 21% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the White Rock/Slab Creek plant generating more or less than last year?
Generation at White Rock/Slab Creek rose 0.3% from 2024 to 2025, from 447,811 MWh to 449,060 MWh. Through August 2026 it is running 1.0% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 447,811 |
| 2025 | 449,060 |
| 2026 through August | 347,054 |
| 2025, same months | 350,416 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 22,941 |
| July 2026 | 17,551 |
| June 2026 | 13,346 |
| May 2026 | 31,180 |
| April 2026 | 71,557 |
| March 2026 | 67,767 |
| February 2026 | 51,829 |
| January 2026 | 70,883 |
| December 2025 | 50,205 |
| November 2025 | 17,051 |
| October 2025 | 11,287 |
| September 2025 | 20,101 |
| August 2025 | 19,197 |
| July 2025 | 14,316 |
| June 2025 | 20,745 |
| May 2025 | 70,873 |
| April 2025 | 75,863 |
| March 2025 | 66,922 |
| February 2025 | 66,345 |
| January 2025 | 16,155 |
| December 2024 | 8,242 |
| November 2024 | 4,116 |
| October 2024 | 12,026 |
| September 2024 | 11,231 |
| August 2024 | 21,465 |
| July 2024 | 18,287 |
| June 2024 | 35,110 |
| May 2024 | 98,174 |
| April 2024 | 92,297 |
| March 2024 | 77,737 |
| February 2024 | 47,363 |
| January 2024 | 21,763 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the White Rock/Slab Creek plant, and when do they retire?
3 operable generators total 269 MW, with an average age of 56 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 0.5 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1960s | 2 | 266 | 99% | none reported |
| 2020s | 1 | 3 | 1% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| H1 | Operating | Conventional Hydroelectric | 133 | 1968 | n/a |
| H2 | Operating | Conventional Hydroelectric | 133 | 1968 | n/a |
| H3 | Operating | Conventional Hydroelectric | 3 | 2020 | n/a |
| H4 | Retired | Conventional Hydroelectric | 1 | 1983 | 2025 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the White Rock/Slab Creek plant?
EIA lists no joint owners for White Rock/Slab Creek. Sacramento Municipal Util Dist operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Sacramento Municipal Util Dist charge homes?
Sacramento Municipal Util Dist, the operator of White Rock/Slab Creek, had an average residential price of 18.93¢ per kWh and an average bill of $125 a month in 2025, 40% below the California average of 31.35¢.
| Measure | Price | Monthly bill | Against California |
|---|---|---|---|
| Sacramento Municipal Util Dist | 18.93¢ | $125 | 40% lower |
| California average | 31.35¢ | $155 | |
| U.S. average | 17.23¢ | $151 | 45% lower |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the White Rock/Slab Creek plant?
White Rock/Slab Creek is in Placerville, El Dorado County, California, at 38.7653° N, 120.7874° W. It sits in the Balancing Authority of Northern California balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in California are similar in size?
California has 238 operable hydro plants with 9,936 MW of capacity, and White Rock/Slab Creek's 269 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Colgate | Yuba | 315 | 1,258,492 |
| New Melones | Tuolumne | 300 | 270,595 |
| Devil Canyon | San Bernardino | 276 | 789,934 |
| White Rock/Slab Creek | El Dorado | 269 | 449,060 |
| Collierville Powerhouse | Calaveras | 253 | 341,671 |
| Folsom | Sacramento | 199 | 503,446 |
| Mammoth Pool | Madera | 190 | 465,889 |
Source: EIA Forms EIA-860 and EIA-923, 2025.